Re: LOTS of US Water Plants Hit by Hacks

rbowman <[email protected]> 6 Aug 2026 20:27:41 GMT
Newsgroups comp.os.linux.misc
Message-ID <[email protected]>
On Thu, 6 Aug 2026 12:35:28 +0100, The Natural Philosopher wrote:

> That is what we did. Often with solid core wires bent round nails driven
> into wood to identify branch points.

The first company I worked for had the contract to make the harnesses for 
the company I eventually went to. The harness board consisted to two 4x8' 
plywood panels with a lot of finishing nails. 

The final connections would be made in the field, so a bundle of 
unconnected wires were left. Nobody wanted to come up short so I think 
everyone in the process added a 'little bit'. I went to the site with the 
VP of the company to do the pilot setup. There was about 5 feet of 'little 
bits' I cut off. The VP gathered up all the wasted wire to take home and 
ram up somebody's butt. 

When I went with the other company I designed in Amphenol connectors.

https://amphenol-aerospace.com/products/mil-spec-type-circulars

No tedious and error prone hookups on site.