Re: LOTS of US Water Plants Hit by Hacks
rbowman <[email protected]> 6 Aug 2026 20:27:41 GMT
| Newsgroups | comp.os.linux.misc |
|---|---|
| Message-ID | <[email protected]> |
On Thu, 6 Aug 2026 12:35:28 +0100, The Natural Philosopher wrote: > That is what we did. Often with solid core wires bent round nails driven > into wood to identify branch points. The first company I worked for had the contract to make the harnesses for the company I eventually went to. The harness board consisted to two 4x8' plywood panels with a lot of finishing nails. The final connections would be made in the field, so a bundle of unconnected wires were left. Nobody wanted to come up short so I think everyone in the process added a 'little bit'. I went to the site with the VP of the company to do the pilot setup. There was about 5 feet of 'little bits' I cut off. The VP gathered up all the wasted wire to take home and ram up somebody's butt. When I went with the other company I designed in Amphenol connectors. https://amphenol-aerospace.com/products/mil-spec-type-circulars No tedious and error prone hookups on site.