From test to prod?

Jim4Prez <[email protected]>
Newsgroups gmane.comp.bug-tracking.mantis.general
Message-ID <[email protected]>
My managers love that I saved them cash with Mantis (I am asking about
them sending some of that cash to Mantis).

After setting up a test server and getting everything configured
the way all the managers wanted with different settings, is there
an easy way to go to prod?  I mean with the DB.  I want to clear
all the test bugs, notes, file uploads, docs etc., but not kill
the users or custom fields.

Can this be done?  Or should I start a fresh install and redo the
custom stuff?

Thanks Mantis team,

Jim

------------------------------------------------------------------------------
This SF.net email is sponsored by:
High Quality Requirements in a Collaborative Environment.
Download a free trial of Rational Requirements Composer Now!
http://p.sf.net/sfu/www-ibm-com
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.