Status on new bug report

Fabian Cenedese <[email protected]> Wed, 07 May 2014 14:00:51 +0200
Newsgroups gmane.comp.bug-tracking.mantis.general
Message-ID <[email protected]>
Hi

I would like to be able to give a status for a new report. It's not
necessarily just "new" or "assigned". If the bug already has a
history before being entered into mantis I want to continue
at the current state, e.g. confirmed.

The config file has g_bug_report_page_fields but described as:

	 * The following fields can not be included:
	 * id, project, date_submitted, last_updated, status,

However there's code that checks for status in the array and
also fills the combo box etc. in bug_report_page.

Is the comment wrong? Is there something that wouldn't work?
Is there another way to influence the status (except for the
global g_bug_submit_status)? I'm using 1.2.15 if this was
already changed.

Thanks

bye  Fabi


------------------------------------------------------------------------------
Is your legacy SCM system holding you back? Join Perforce May 7 to find out:
&#149; 3 signs your SCM is hindering your productivity
&#149; Requirements for releasing software faster
&#149; Expert tips and advice for migrating your SCM now
http://p.sf.net/sfu/perforce