Re: Workspace vs Projects (WAS Re: Forums)
Chris H <[email protected]>
| Newsgroups | gmane.comp.cms.opengroupware.discuss.general |
|---|---|
| Message-ID | <[email protected]> |
On July 27, 2004 1:31 pm, Adam Tauno WIlliams wrote: > > It then becomes a packaging consideration once the design is overcome. A > > serious element to consider but this would be more consistent with the > > notion of workspace then a simple renaming convention. > > I'm not certain I understand this statement. This was poorely presented as it referred to an alternative document storage backend as presented in helge's online notes here: http://docs.opengroupware.org/Members/helge/DocumentAPI/DocStorage/ While the direct technical solutions are varied and most interesting one aspect of any "solution" when it comes to software is how it is delivered to the end user. This is sometime referred to "commercially" as packaging. So the concern that I was pointing out is that regardless of what is added, consideration should be given at the design stage preferably how that new component will be bundled and installed with the new revised software offering to ensure easy installation, configuration etc. While zope integration is fascinating I can see many issue with delivery, installation and configuration of the software product referred to as opengroupware.org ver 2.0 for example. Collectively this is sometimes referred too as "packaging" in some circles. No in all however. Hope thats better..:) regards /ch -- OpenGroupware.org Discussion [email protected] http://mail.opengroupware.org/mailman/listinfo/discuss