BETA News 10-05-21 -- ALPHA Released
"Carlos Aguilera" <[email protected]>
| Newsgroups | gmane.comp.emulators.turnkey-mvs |
|---|---|
| Message-ID | <B39B1B6D35E5426E8D7C9F4BA92721CC@carlospvwynf59> |
Phil: According to the S013 abend this is the explanation I find: The error occurred during processing of an OPEN macro instruction. This system completion code is accompanied by message IEC141I. Refer to the explanation of message IEC141I for complete information about the task that was ended and for an explanation of the return code in register 15 Possible causes for this abend include: 1. DCB parameters conflict, no BLKSIZE or not valid multiple of LRECL 2. Merge - SORTIN01 does not contain the maximum blocksize 3. JCL -- tried to create a PDS without allocating directory blocks 4. Missing or misplaced SYSIN DD card 5. PDS member not found when coded in JCL Carlos Aguilera 1401 Liggates Rd Lynchburg VA 24502 Carlos-FiVMtmHp2a9Wk0Htik3J/[email protected] 434-401-4828