Re: Notes from the 2004-12-03 release-wranglers call...
Adam Jackson <[email protected]>
| Newsgroups | gmane.comp.freedesktop.release-wranglers,gmane.comp.video.mesa3d.devel |
|---|---|
| Message-ID | <[email protected]> |
On Friday 03 December 2004 19:49, Roland Mainz wrote: > 2. The schedule: > - 8 Dec 2004: The normal patch nomination phase ends > - 13 Dec 2004: Final patch approval - the remaining patches are getting > either approved or rejected in the release-wranglers phone call > - 15 Dec 2004: Final date when all approved patches must be checked in. > After that the Release Canidate 1 will be tagged and source tarballs be > created. More release canidates will follow based on the results of the > testing phase I've apparently volunteered to merge Mesa 6.2 for this release. However, I'll be out of town this week until roughly 8pm EST on the 11th. This makes the schedule a little tight. Assuming everyone wants 6.2 in 6.8.2 - and this seems to be the consensus - I'd like to ask Roland's permission to nominate the patch on the 11th. (The alternative would be for someone else to take care of the merge and patch generation, and I certainly wouldn't object.) Mesa folks, if there's any bugfixes in HEAD that should be applied to the 6.2 branch, this should happen soon. I'd suggest a 6.2.1 tag once any further fixes are in, and then I'd merge that. - ajax _______________________________________________ release-wranglers mailing list release-wranglers-PD4FTy7X32lNgt0PjOBp9y5qC8QIuHrW@public.gmane.org http://lists.freedesktop.org/mailman/listinfo/release-wranglers
signature.asc
(application/pgp-signature, 189 B)
-----BEGIN PGP SIGNATURE----- Version: GnuPG v1.2.4 (GNU/Linux) iD8DBQBBsTCbW4otUKDs0NMRAlXIAJ9x7TUkMPxLsRgkSQkRSj6eEVphigCgma1p p9wTkrhpzJ8Av9PACsOhU1E= =CQ4U -----END PGP SIGNATURE-----