Re: Unreliable test suites?
Doug Evans <[email protected]>
| Newsgroups | gmane.comp.gdb.devel |
|---|---|
| Message-ID | <CAP9bCMTmBe+3xxkHx4CzcdWYZSeReWynAfG1VdCic9vLs985_g@mail.gmail.com> |
On Wed, Oct 14, 2015 at 12:58 PM, <[email protected]> wrote: > I'm doing some work on gdb and want to run the testsuites to confirm that I didn't mess it up. > > The problem is that a number of them seem to be quite unreliable. I've seen test runs where gdb.btrace/step.exp and/or stepi.exp have a pile of failures, but then when I rerun either just those tests, or the whole suite, they pass. > > Since I haven't a clue how the reverse execution stuff works, I don't know if this is expected. It seems strange. I also don't know what to do about it if it's not supposed to be like that. For now, I'm just running things a couple of times, and if they pass once, I call it good enough. Those particular tests don't fail for me, even with check-parallel, but then it could depend on the target. OTOH several tests *are* flaky, especially under load. What I normally do is for the failures, run just those tests one at a time (to reduce load induced failures). And do that in the before and after trees. If they fail in the before tree too, then don't worry about it.