remote host testing expectations re multiple simultaneous connections
Sandra Loosemore <[email protected]>
| Newsgroups | gmane.comp.gdb.devel |
|---|---|
| Message-ID | <[email protected]> |
I've noticed that there are several gdb.mi tests that start GDB before
building the test program, like this bit of code from mi-cli.exp:
gdb_exit
if [mi_gdb_start] {
continue
}
standard_testfile basics.c
if { [gdb_compile "${srcdir}/${subdir}/${srcfile}" "${binfile}"
executable {debug}] != "" } {
untested "failed to compile"
return -1
}
mi_gdb_test "-interpreter-exec" \
{\^error,msg="-interpreter-exec: Usage: -interpreter-exec interp
command"} \
"-interpreter-exec with no arguments"
E.g. there's an implicit expectation that when testing on a remote host,
it can start GDB and leave it running and waiting to accept GDB commands
while running some other shell commands to build the test program on a
different channel to the same remote host. Is this a reasonable
expectation that is documented somewhere? Or are the test cases that
are structured like this just broken? :-S If the latter I will submit
a patch to fix them.
-Sandra