Re: XML format for calendars

Mikael Hallendal <[email protected]> 09 Dec 2002 22:59:35 +0100
Newsgroups gmane.comp.gnome.apps.mr-project.devel
Organization CodeFactory AB
Message-ID <[email protected]>
mån 2002-12-09 klockan 23.50 skrev Roberto Perez:

> I think that it is a good design but i have a question. I dont know
> exactly which are the puposes of calendar but, wouldn't it be a good
> idea to include who is working in each interval ?
> 
> 	<interval start="10.00" end="13.00" workers="Sandy, John"> 

That information doesn't go here (it's part of the allocations). The
interval just says that in a particular calendar there is a working
interval between 1000 and 1300. If a resource uses this calendar he will
be assigned to work on his tasks between these times.

Regards,
  Mikael Hallendal
-- 
Mikael Hallendal                [email protected]
CodeFactory AB                  http://www.codefactory.se/