best practices
"David M. Cvet" <[email protected]>
| Newsgroups | gmane.comp.gnome.apps.mr-project.user |
|---|---|
| Message-ID | <[email protected]> |
> *Kirk Strauser * mrproject at lists.codefactory.se > <mailto:mrproject%20at%20lists.codefactory.se> > /Tue Dec 10 17:42:00 2002/ > > * Previous message: [MrProject] posting Gantt charts on the web > <http://lists.codefactory.se/pipermail/mrproject/2002-December/001043.html> > * Next message: [MrProject] Build Problem for mrproject-0.7 > <http://lists.codefactory.se/pipermail/mrproject/2002-December/001045.html> > * *Messages sorted by:* [ date ] > <http://lists.codefactory.se/pipermail/mrproject/2002-December/date.html#1044> > [ thread ] > <http://lists.codefactory.se/pipermail/mrproject/2002-December/thread.html#1044> > [ subject ] > <http://lists.codefactory.se/pipermail/mrproject/2002-December/subject.html#1044> > [ author ] > <http://lists.codefactory.se/pipermail/mrproject/2002-December/author.html#1044> > > > ------------------------------------------------------------------------ > >I want to start using MrProject for my scheduling needs, but I'm a little >unclear about how to start. For example, I'm an independent contractor, so >I have quite a few clients, and I'm not sure whether I should be shoehorning >all of the tasks into one big project file, or trying to coordinate them >across several smaller ones. > >General: > > Is it possible to give a set of default values system-wide? For example, >I'll also have the same resources available - namely, me and a couple of >subcontractors. > I just started using mp0.7 and have found a similar constraint. Resources are not available system wide (I assume that to mean, across different project files). It would be extremely useful to have resources stored as an independent object so that one can import the resource pool into a new project, deleting what's not needed and adding new resources for that project. At this time, resources are internalized into the same single project file. A work around is to create a separate "project file" which only contains resources, i.e. resources.mrproject and use that as a template to create new projects (i.e. tasks are empty in this file) and populate the project with new tasks while having the resources already defined. Remember to save the new project with a different name otherwise you'll hammer your "resources.mrproject" file. > >Time: > > Is it possible to give projects a default time resolution of less than 1 >day? Many of my tasks are in 15- or 30-minute blocks. Can I configure >MrProject to not display overnight hours by default? > Customization of mrproject essentially doesn't exist at this point. I'm sure it's on tap for the full version whenever it's ready. > >Cost: > > How do you assign a cost to a task? > Can't assign cost to a task, but certainly to a resource. I haven't tried to aggregate project costs at this point. It would be useful to be able to cost out a project and achieve the granularity of costing out tasks too. /dc > > >In short, I know that this is a really flexible app, which can be a >double-edged sword for new users. :) >-- >Kirk Strauser >In Googlis non est, ergo non est. > > > -- ____________________________________________________________ David M. Cvet 401-159 Frederick St., Toronto, Ont. Canada M5A 4P1 CELL:+1 416 726-8314 FAX:+1 416 366-7448 ____________________________________________________________