Re: Problems linking a little complex task
Richard Hult <[email protected]> 13 Jun 2003 15:43:01 +0200
| Newsgroups | gmane.comp.gnome.apps.mr-project.user |
|---|---|
| Organization | CodeFactory AB |
| Message-ID | <[email protected]> |
> 1) Selecting the kind of the relationship(SS, SF, FS,FF) doesn't work. > The time calcs are allways done as 'FS'. Yeah, known bug/unimplemented feature. > 2) With some task linked, some time-calculations are broken. I don't > know why, but the next sentece appears in the console: > > (mrproject:20563): GLib-CRITICAL **: file gnode.c: line 274 > (g_node_insert_before): assertion `parent != NULL' failed > > And the node calcs fails. The solution was to delete the dependences. Hm, if you could find a way to reproduce this and submit a bug at http://bugzilla.codefactory.se/ that would be great! > 3) With 30 task the GUI becomes very very slow. We haven't really tried to optimize it yet, I think it could be made a lot snappier. Regards, Richard -- Richard Hult [email protected] CodeFactory AB http://www.codefactory.se/