Moving tasks to be done to after today
Maurice van der Pot <griffon26-bCGDfOjggl9Wk0Htik3J/[email protected]>
| Newsgroups | gmane.comp.gnome.apps.planner.devel |
|---|---|
| Message-ID | <[email protected]> |
What if planner would always put completed (parts of) tasks left of
today and uncompleted (parts of) tasks right of today?
Imo this would have the advantage that it is more clear when you are
behind or ahead of schedule.
The way I envision it, it would:
- split tasks that have been partly completed
(upper case is completed, lower case is the part still to be done)
today
|
AAA aaaa
BBBBB bbbb
- join multiple small completed parts of a task into 1, so suppose you
work on task 'a' for 2 days. Afterwards it would be:
today
|
AAAAA aa
BBBBB bbbb
instead of:
today
|
AAA AAaa
BBBBB bbbb
This is just to prevent cluttering the plan when you work on multiple
tasks in parallel.
Thoughts?
Regards,
Maurice.
--
Maurice van der Pot
Gentoo Linux Developer [email protected] http://www.gentoo.org
Creator of BiteMe! griffon26-bCGDfOjggl9Wk0Htik3J/[email protected] http://www.kfk4ever.com
_______________________________________________
Planner-dev-list mailing list
[email protected]
http://mail.gnome.org/mailman/listinfo/planner-dev-list
signature.asc
(application/pgp-signature, 189 B)
-----BEGIN PGP SIGNATURE----- Version: GnuPG v2.0.5 (GNU/Linux) iD8DBQFHESPmMGnpIbeahxwRAnRAAJ4wI7hbrf49nfgMpnc2K5e5RemhUACgp5eS 3YqjXdXPZiMqgBJh3K/3+Tw= =vznf -----END PGP SIGNATURE-----