Re: Planner-list sharing or exclusive usage of resources
Maurice van der Pot <griffon26-bCGDfOjggl9Wk0Htik3J/[email protected]>
| Newsgroups | gmane.comp.gnome.apps.planner.user |
|---|---|
| Message-ID | <[email protected]> |
On Tue, Feb 03, 2009 at 02:08:05PM +0100, Joachim Fehn wrote: > I mean, the two tasks should be one after the other, because the team can do > only one job at a time: 1st Server (prio 8), then Athentication (prio 4). > > planner puts the two tasks into the same time slice an produces a resource > usage of 200%. What you need is resource levelling, which is a feature that is currently being implemented. > (planner 0.14.2 on openSuse 10.3) > > BTW: Is there an online manual? I didn't find one with the distribution nor at > gnome.org. The help menu should contain a link to the user guide. If it doesn't, it's a bug (probably in packaging). Regards, Maurice. -- Maurice van der Pot Gentoo Linux Developer [email protected] http://www.gentoo.org Gnome Planner Developer griffon26-bCGDfOjggl9Wk0Htik3J/[email protected] http://live.gnome.org/Planner _______________________________________________ Planner-list mailing list [email protected] http://mail.gnome.org/mailman/listinfo/planner-list
signature.asc
(application/pgp-signature, 197 B)
-----BEGIN PGP SIGNATURE----- Version: GnuPG v2.0.9 (GNU/Linux) iEYEARECAAYFAkmTJr4ACgkQMGnpIbeahxzyIQCghOTzLg7SCyJcXDR2FrQYT0Bz UrMAoIpysr44wMvP6CpCtadTdOumA9Bc =kSwd -----END PGP SIGNATURE-----