Planner-list Planner problem with asiing resources

<[email protected]> Thu, 24 May 2012 11:17:21 +0000
Newsgroups gmane.comp.gnome.apps.planner.user
Message-ID <[email protected]>
Hello,
I've got the problem with assign resources in Planner.
I've got a task  with fixed duration. I need to assign multiple resources with different number of units. However, this is impossible and Planner assign the same number of units to the checked resources.
Is there is some way how can I change this number?
Thanks
Josef Trbusek