Re: 7-mode upgrade mismatch
Tim McCarthy <[email protected]>
| Newsgroups | gmane.comp.hardware.netapp |
|---|---|
| Message-ID | <DM6PR14MB28594FFCA40210B966BAAE28F3B39@DM6PR14MB2859.namprd14.prod.outlook.com> |
Probably the best thing to do is call support 🤓 If I were to try something I would not the node to the bot menu. I think there is an option to install software. Been a while. I may be wrong Get Outlook for iOS<https://aka.ms/o0ukef> ________________________________ From: Toasters <[email protected]> on behalf of Carl Howell <[email protected]> Sent: Thursday, February 4, 2021 8:21 AM To: [email protected] Subject: 7-mode upgrade mismatch I have a 3240 cluster with node A running 8.2.5P5 and node B running 8.1.4P9. Node A was upgraded to 8.2.5P5 and giveback was performed from node B. Takeover of node B by node A was performed, and both nodes are now running on node A. But, node B was not upgraded to 8.2.5P5 before the takeover and now when we attempt to giveback to node B so that it can be upgraded, it panics. So, node A running 8.2.5P5 in takeover mode. Node B running 8.1.4P9 has been taken over by A. How can we get B upgraded to 8.2.5P5? Thanks, --Carl _______________________________________________ Toasters mailing list [email protected] https://www.teaparty.net/mailman/listinfo/toasters