[openi18n-im:01389] r12.4 and r12.2.1 Schedule [Was: Re: Re: r12.4 and r12.2.1 schedule draft]

Leon Ho <[email protected]> Thu, 19 May 2005 16:24:21 +1000
Newsgroups gmane.comp.internationalization.input-methods
Message-ID <[email protected]>
Thanks everyone for input. Here is the schedule for r12.4 and r12.2.1. Feature 
freeze is soon so let's get the discussion going here and finalize the 
list :)


* r12.2.1
** Code Freeze - Jun 21
** QA Period - Jun 22-24
** Release - Jun 28


* r12.4
** Feature Freeze - May 27
** Development Start - May 27
** API/ABI Freeze - Jun 30

** r12.3-beta1 - Jul 15
** QA Period - Jul 18-20
** r12.3-beta2 - Aug 5
** QA Period - Aug 8-10

** Code Freeze - Aug 19

** r12.3-rc1 - Aug 19
** QA Period - Aug 22-23
** r12.3-rc2 - Aug 26
** QA Period - Aug 29-31

** Release - Aug 31


   San Fransisco        17:00PDT (16:00PST)
   UTC          00:00
   Beijing      08:00
   Tokyo                09:00
   Brisbane     10:00


Cheers,
Leon

On Wednesday 18 May 2005 17:46, Jens Petersen wrote:
> Jens Petersen wrote:
> >>   Release - Aug 31
>
> Also since a lot of our developers are in East Asian timezones (including
> the release engineer;), shall we make the time of all deadlines in the
> schedule to be 00:00UTC (instead of 14:00UTC).
>
> ie
>
>    San Fransisco	17:00PDT (16:00PST)
>    UTC		00:00
>    Beijing	08:00
>    Tokyo		09:00
>    Brisbane	10:00
>
> Does that sound reasonable?
>
> Jens