Re: Apache Tomcat 9.1.x release timeframe

Mark Thomas <[email protected]> Fri, 17 Jul 2026 17:26:29 +0200
Newsgroups gmane.comp.jakarta.tomcat.user
Message-ID <[email protected]>
17 Jul 2026 16:57:16 Eddie Rowe via users <[email protected]>:

> The helpful links posted again indicate there will be a "few weeks" of=20
> overlap between the release of 9.1 and the EOL of 9.0.=C2=A0 Does a "few=
=20
> weeks" mean 2 weeks or does it mean like 8 weeks?=C2=A0 I can appreciate=
=20
> this 9.1 being treated like a normal maintenance release in the 9.0.x=20
> series but I don't think there is an appreciation that upgrading to=20
> those minor releases can be painful for some of us.=C2=A0 (Ignoring for t=
he=20
> moment that some are using connectors that are being removed in 9.1=20
> which breaks things for us.)=C2=A0 Each release of Tomcat, despite the ha=
rd=20
> work of several persons, has bugs.=C2=A0 If the first release of 9.1 has =
a=20
> bug that affects someone they might have to stay on 9.0.x and if 9.1=20
> corrects a security issue that puts people in a difficult position.=C2=A0=
=20
> And there are going to be more than a few persons who try to upgrade=20
> only to learn their AJP connectors no longer work. 8-(

None of the above is any different to any other point release upgrade.

You still have 8 months to stop using the features that will be removed=20
in the 9.0.x to 9.1.x change over.

AJP !=3D APR - they are completely different features. Only the APR/Native=
=20
connector is being removed. AJP support will continue.

I don't have a great deal of sympathy for security teams that can't get=20
their head around how this transition will occur and why is should be a=20
complete non-issue but parallel releases of the first 9.1.x and last=20
9.0.x releases some time in March 2027 are certainly possible - even=20
though I continue to be of the view that is unnecessary.

Mark

(Yes, the exact details of how this will work have evolved over time but=20
the aim remains the same, the smoothest possible transfer from 9.0.x to=20
9.1.x for those users who still haven't made the transition from Java EE=20
to Jakarta EE)

>
>
>
> -----Original Message-----
>> I think Mark just confused the dates. According to the official
>
>> documentation (https://tomcat.apache.org/tomcat-9.0.x-eos.html) and=20
>> Mark
>
>> himself
>
>> (https://lists.apache.org/thread/71ymfh35x8fnz7pnm6cylmkwsyblto97),
>
>> there will be a 9.1.x release before 9.0.x is EOL.