biojava 3.0 release plan

Andreas Prlic <[email protected]>
Newsgroups gmane.comp.java.bio.general
Message-ID <[email protected]>
Hi,

BioJava 3 has matured massively in SVN during this year and it is time to
prepare a first release. I propose the following release plan. See also two
other topics for discussion below.

Release Plan 3.0

* Alpha release build(s)
  during the next days I will start to provide a first alpha release build.
This will be followed by semi-regular follow up alpha builds (depending on
SVN activity)

- During the next weeks any missing features should be committed to SVN.
 Refactoring of code can still be done during this time.
- Add and update documentation in wiki
- Module maintainers: check compile warnings for your modules in automated
builds. Make sure no compile warnings are being displayed.


* Beta release build(s)
  the first beta release is scheduled for the weekend Nov 21st.

- From this point on only minor changes (bug fixes) should be added to the
code base
- Module maintainers: check and update javadoc for your modules

* Release 3.0
  The 3.0 Release is scheduled for Dez 12th


There are two things we should still discuss:

* backwards compatibility:
the current "core" module contains tons of legacy 1.7 code. Shall I go ahead
and delete this module?

* documentation:
The wiki contains tons of documentation for 1.7 which will not be useful for
3.0. As a procedure for cleaning this up and avoiding confusion I suggest to
move all 1.7 related docu into a special section of the wiki. All toplevel
links to documentation should point to 3.0. Any other suggestions?


Andreas
_______________________________________________
Biojava-l mailing list  -  [email protected]
http://lists.open-bio.org/mailman/listinfo/biojava-l
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.