force building project #2 programaticaly from another project #1
"Christopher Riffle" <[email protected]>
| Newsgroups | gmane.comp.java.cruise-control.user |
|---|---|
| Message-ID | <[email protected]> |
Hi everyone, I have 3 cc projects in my config.xml file: 1, 2and 3 that I would like to have executed in order. They perform thetasks below: 1: uses interval and element to look for changes in the repo every 180seconds, then updates source 2: compiles source 3: performs distribution tasks ? Is it possible when #1 runs and finishes to have #1 programaticallyforce #2 to build immediately, and then likewise have #2 run/finishthen have #2 force a build of #3? I'm kind of getting thisdone in a roundabout way by having #2 use the approach, with the #2 at 10 seconds, but I don't like this approach too much tohave #2 checking the logs of #1 every 10 seconds. Maybe if I set theschedule interval of #2 to be the same or very slightly longer than theschedule interval of #1, then if #1 detected changes and ran -- # 2would check shortly after #1 because their intervals were the same. Ihope it wouldn't get confused with the intervals happening at differenttimes to where #1 would find changes and run, while # 2 would thenstart waiting that long interval - (the same interval as #1 waited)instead of having #2 look for changes in #1 immediately after #1finished running - to give the illusion of #2 being forced by #1 (whichis my goal). Thanks so much for any tips! Hope I didn't explain it poorly. Have a good day, Chris CONFIDENTIALITY NOTICE: This email and any attachments are intended solely for the use of the named recipient(s). This e-mail may contain confidential and/or proprietary information of Scientific Research Corporation. If you are not a named recipient, you are prohibited from making any use of the information in the email and attachments. If you believe you have received this email in error, please notify the sender immediately and permanently delete the email, any attachments, and all copies thereof from any drives or storage media and destroy any printouts of the email or attachments. EXPORT COMPLIANCE NOTICE: This email and any attachments may contain technical data subject to U.S export restrictions under the International Traffic in Arms Regulations (ITAR) or the Export Administration Regulations (EAR). Export or transfer of this technical data and/or related information to any foreign person(s) or entity(ies), either within the U.S. or outside of the U.S., may require export authorization by the appropriate U.S. Government agency prior to export or transfer. In addition, technical data may not be exported or transferred to certain countries or specified designated nationals identified by U.S. embargo controls without prior export authorization. By accepting this email and any attachments, all recipients confirm that they understand and will comply with all applicable ITAR, EAR and embargo compliance requirements. ------------------------------------------------------------------------------ Enter the BlackBerry Developer Challenge This is your chance to win up to $100,000 in prizes! For a limited time, vendors submitting new applications to BlackBerry App World(TM) will have the opportunity to enter the BlackBerry Developer Challenge. See full prize details at: http://p.sf.net/sfu/Challenge _______________________________________________ Cruisecontrol-user mailing list [email protected] https://lists.sourceforge.net/lists/listinfo/cruisecontrol-user