Custom date/time range with svn modificationset?
Nhat Tran <[email protected]>
| Newsgroups | gmane.comp.java.cruise-control.user |
|---|---|
| Message-ID | <[email protected]> |
Hi all, Is it possible to use a custom date/time range for the svn modificationset? As far as I am aware, the svn modificationset uses the "lastsuccessbuild" and "current" time for the project as the range to check for modifications. Anyone know of a way to override these two values? I currently have the following setup for Cruise Control (v2.7.1): * Machine A: builds and distribute product installation package. * Machine B: retrieves product installation package and do regression tests. For ease of tracking for the developers, I would like Machine B to include a list of modifications to the product's source. Obviously, this need to be in relation to the source used to create the installation package itself, not the time when the regression tests are running. If possible, I would like to do the following: * Machine A: outputs the "cctimestamp" value to a file which is included in the distribution step. * Machine B: uses "product.lastsuccess" and "product.latest" for the as the range for the svn modificationset, where: -> "product.latest" is the "cctimestamp" value from Machine A. -> "product.lastsuccess" is the "product.latest" of the last successful regression run. Hope I haven't confused too many people. :) Any assistance/suggestions you can provide is greatly appreciated. Thank you for your time. Regards, Nhat Tran ------------------------------------------------------------------------------ Let Crystal Reports handle the reporting - Free Crystal Reports 2008 30-Day trial. Simplify your report design, integration and deployment - and focus on what you do best, core application coding. Discover what's new with Crystal Reports now. http://p.sf.net/sfu/bobj-july