Re: Changing the resulturl layout
Paul Müller-Salget <[email protected]>
| Newsgroups | gmane.comp.java.cruise-control.user |
|---|---|
| Message-ID | <02738CCB0516AA4DB10D40CC92B19D9F4328EDE6D7@MBX12.EXCHPROD.USA.NET> |
Just an additional thought: If you have an idea how to change the dashboard in order to work with the log=log links, that would be fine for me too. It's much easier to change one dashboard than 40 CruiseControl installations ;-) Tanks Paul From: Paul Müller-Salget [mailto:[email protected]] Sent: Dienstag, 11. August 2009 13:12 To: [email protected] Subject: [Cruisecontrol-user] Changing the resulturl layout Hi all, I know there were some questions like this in the past, but I fail to find an answer that helps me in my situation, so please be patient with me. I am currently administrating a permanent build and integration environment with ~40 Servers and want to use the dashboard as a central administrating- and overview platform. That is working quite splendid, as soon as the host has enough power, but now I am encountering a problem with the Emails CruiseControl sends. The Resulturl is defined as: http://dashboard/tab/build/detail/${project.name}<http://dashboard/tab/build/detail/$%7bproject.name%7d> and CruiseControl adds the information: "?log=log20090811104941Lbuild.719" resulting in a link like this: http://dashboard/tab/build/detail/HEAD_perm_permwin04?log=log20090811104941Lbuild.719 The correct link on the dashboard however would be: http://dashboard/tab/build/detail/HEAD_perm_permwin04/20090811104941 So, every time one of the developers clicks the link in the mail, he end up on the main page of the project (http:// dashboard/tab/build/detail/HEAD_perm_permwin04), which is quite confusing. For example he might receive a "build failed" mail, but during his lunch time or something like that. Afterwards he clicks the link and end up on a page that shows "build successful" because in the meantime the build was fixed. I tried to find a way to change the link format, but all I found was a hint how to change the CruiseControl Code to adapt to the dashboard. That would be quite ugly for me, as I would have to update 40 servers with a tweaked version and updating to new CruiseControl releases would get quite painful. I think there must be a real solution for this, as -if I am not missing something- everyone who tries to use the dashboard with an email publisher will have the same problem. I have a sandbox in which I can try and error as much as I like, so any suggestion is very welcome, even if untested. Regards Paul ------------------------------------------------------------------------------ Let Crystal Reports handle the reporting - Free Crystal Reports 2008 30-Day trial. Simplify your report design, integration and deployment - and focus on what you do best, core application coding. Discover what's new with Crystal Reports now. http://p.sf.net/sfu/bobj-july _______________________________________________ Cruisecontrol-user mailing list [email protected] https://lists.sourceforge.net/lists/listinfo/cruisecontrol-user