Beginning cruisecontrol user needing help
congabeatz <[email protected]>
| Newsgroups | gmane.comp.java.cruise-control.user |
|---|---|
| Message-ID | <[email protected]> |
Hello All- My cruisecontol experience is pretty limited, so hopefully this is an easy one to answer: Suppose I have two projects, Project1 and Project2. I want Project1 to be executed if modifications have been detected within source control, and then I want Project2 to be executed after Project1 has completed. So far I'm able to accomplish this much. What I want to ensure though, is that Project1 always gets kicked off *unless* Project2 is currently running. In other words, if Project2 is currently running and a modification was detected, I don't want Project1 to be executed until after Project2 has completed. Thanks in advance :-) -- View this message in context: http://old.nabble.com/Beginning-cruisecontrol-user-needing-help-tp31818134p31818134.html Sent from the CruiseControl - User mailing list archive at Nabble.com. ------------------------------------------------------------------------------ EditLive Enterprise is the world's most technically advanced content authoring tool. Experience the power of Track Changes, Inline Image Editing and ensure content is compliant with Accessibility Checking. http://p.sf.net/sfu/ephox-dev2dev