Question about modificationset & cvs changes
Emerson Cod <[email protected]>
| Newsgroups | gmane.comp.java.cruise-control.user |
|---|---|
| Message-ID | <[email protected]> |
Hi, we do have problesm with our CruiseControl (2.8.4), that some changes are not detected and therefore no build is started. We have one cruisecontrol instance with several projects. Some of these projects run continously, some on a fix time in the night. I found in the configuration references, how cruisecontrol checks for modifications in cvs. There it is written lastbuildtime is replaced with the date of the last build, using the date format yyyy-MM-dd HH:mm:ss 'GMT'. My question is - what is "date of the last build". Is it really the one of the current project, or of the cruiseinstance ? So if I have project A and Project B. There are changes in both simultanously. A is triggered (continously) and builds. B is set up in the night and there it is checked for modifications. Is the "date of the last build time", really the one of Project B or is i project A ? If so, is this intended ? If not, would could be the problem ? (running s simple cvs -n update shows the differences). Thanks ------------------------------------------------------------------------------ EditLive Enterprise is the world's most technically advanced content authoring tool. Experience the power of Track Changes, Inline Image Editing and ensure content is compliant with Accessibility Checking. http://p.sf.net/sfu/ephox-dev2dev _______________________________________________ Cruisecontrol-user mailing list [email protected] https://lists.sourceforge.net/lists/listinfo/cruisecontrol-user