Hi Glenn,

Multiple 'ant' tags under <schedule> will not work (at least not like 
you want).

 From the docs:
http://cruisecontrol.sourceforge.net/main/configxml.html#schedule

Note: Only one builder is used for a given interval where modifications 
are found. Builds using the time attribute take precedence over builds 
using the multiple attribute. If no matching time builds are found the 
multiple builds are evaluated by the value of their multiple from high 
to low. If there are multiple Builders with the same multiple only one 
will build but which one is undefined.


You may want to create two <project> tags, like the example: "The 
dependent build" from 
http://confluence.public.thoughtworks.org/display/CC/CruiseControl+Scheduling+Scenarios.

Dan


Date: Mon, 6 Feb 2012 18:12:57 -0500
From: Glenn Boysko <[email protected]>
Subject: [Cruisecontrol-user] Question on Configuring Project with
	Nightly build, Rebuild on Failure
To: "[email protected]"
	<[email protected]>

Hello CruiseControllers:

I am using CruiseControl 2.8.4 and am wondering if it is possible to 
configure a project to build according to these guidelines:


*         Assuming the last build was successful, kick of a new build at 
fixed time each night (e.g., 8am)

o   Run the project regardless of whether there was source control changes

o   This project is a DB validation project and changes may occur 
outside of source code changes

*         If the last build was not successful, kick off a new build if 
there was changes to the source code tree

o   We store baseline results in the SVN source tree, so if those 
change, that might all we need to do to get the build running again.

I have been trying to setup a project with these characteristics, but 
with no luck:


*         project has requireModifications set to false

*         modificationset identifies the changes that would trigger a 
new build if the baseline data changes

*         schedule has two ant children:

o   One with time="0800"

o   One with multiple="1"

I've been reviewing 
http://confluence.public.thoughtworks.org/display/CC/CruiseControl+Scheduling+Scenarios 
but I don't find my scenario.

Is this possible with 2.8.4?

Thanks,
Glenn



------------------------------------------------------------------------------
Keep Your Developer Skills Current with LearnDevNow!
The most comprehensive online learning library for Microsoft developers
is just $99.99! Visual Studio, SharePoint, SQL - plus HTML5, CSS3, MVC3,
Metro Style Apps, more. Free future releases when you subscribe now!
http://p.sf.net/sfu/learndevnow-d2d