JDOM 1.x release schedule
Rolf Lear <[email protected]>
| Newsgroups | gmane.comp.java.jdom.general |
|---|---|
| Message-ID | <[email protected]> |
Hi All. Given the bug fix pending in the JDOM 1.1.x stream I believe a new release of the JDOM 1.1.x is required. On the other hand I do not want to be releasing 1.1.x versions for every issue that arises. I think a compromise schedule is viable, and it goes something like this: 1. build the current JDOM 1.x stream with the current bug fix in it and post it on the github download page. Call it JDOM.1.1.x.hotfix.2012.01.25.zip 2. if any additional bug fixes are needed another hotfix package will be built. 3. at some fixed point in time we schedule a formal 1.1.3 release that contains all the fixes. 4. if any bug comes up that is considered to be 'critical' an earlier-than-schedule release could be made. In this case, I think 1st March 2012 is a good candidate date... 5 weeks from now. Later today I will build the current JDOM 1.x code base as JDOM.1.1.x.hotfix.2012.01.25 and I will post it to github. If any other issues arise I will create hotfix updates to address them. On March 1st I will rebuild the JDOM code again as 1.1.3 and do the formal release process to www.jdom.org as well as maven-central. Does this sound like a viable process? Rolf _______________________________________________ To control your jdom-interest membership: http://www.jdom.org/mailman/options/jdom-interest/[email protected]