| Message-ID | <[email protected]> |
Dag Andersen wrote: >>By subtask, do you mean a collection of tasks (almost like a >>miniproject?) That can be handled by PERT/CPM modification so that >>the collection has a defined duration gotten by calculation. > > No, I meant the oposit. A subtask is one of the tasks in a > collection :) A task that have subtasks (children) is a summary task > (also sometimes called a container). > A summary task does not have resources, duration etc, it just sums up > its subtasks. So the summary task starts when the first subtask > starts and finishes when the last subtask finishes. > One thing a summary task can have is relations. Linking a task to a > summary task should have the same effect as linking the task to all > the summary tasks subtasks. (puhh) OK. Not implemented in pert/cpm. But could easily be implemented. >>I really meant a little more. The functions to add and remove >>nodes, etc., could be separated. Maybe that's not so practical. > > Yes, I had a feeling it was more to it. > Well, from the code a can see that there are a number of functions > involved. > These are defined in KPTNode: > - initialize_arcs > - set_up_arcs > - set_unvisited_values > - set_pert_values > They all mine data from the node and recursivly from its children, so > to separate these from KPTNode, I'd say you need a "copy" of the > project node structure for them to operate on. > > These are defined in KPTProject: > - pert_cpm > - forward_pass > - backward_pass > These gets duration from each node and writes back > erliestStart/latestFinish. > > So one way to do this is to give you a "copy" of the nodes (doesn't > *need* to be a full copy, only the info you need) then you calculate, > store the results in the "copy" and returns it. It is then used to > update the nodes. > What do we gain? We can make PERT/CPM independent of KPlato, of > cource. Other than that, I don't know. That was probably the main gain for me. If pert/cpm is independent it is easier to test robustly. > OTOH, there might be other ways to do this, and if you rewrite, who > knows? Maybe an interface class. I'd need to look more at this. >>eventually pert/cpm might call any duration function so probably >>ought to be called with a pointer to member function argument whose >>default argument was expected duration. This would allow standard >>pert/cmp and also monte-carlo type stuff. > > Or called with an enum specifying what "type" of duration to get, so > that PERT/CPM calls node->duration(type) instead of > node->expectedDuration() as now? > That is probably better. It's a little more flexible and certainly more readable. >>IIRC that's right. The problem is I don't recall and I don't see >>what the rest of the code does with this information. pert/cpm is >>not yet suggesting when a task should start - just when it could >>start. > > Yes, atm I use earliestStart/latestFinish together with duration and > ASAP/ALAP to place the node within the timespan. I think ASAP/ALAP is > not a problem, they don't really affect the PERT/CPM calculations (at > least not before resources are considdered?.) The other constraints > will do, though: OK, very useful to know. > Start Not Earlier Than, Must Start On etc means that pert_cpm must > place these node on specific times and it may not be possible in > which case erros must be signaled. a modified pert/cpm can handle these. >>Good idea. I can write the function. It will be easier if you can >>say what you want it to return. If it's called before a new >>dependency is added all it must do is check the dependency and >>return true/false. If you want something more robust (maybe someone >>introduces several bad dependencies) then it could return a list of >>possible dependencies where at least one had to be removed. > > I was thinking: when a dependency is defined it is checked for > validity and rejected if it's not ok. There are atm 2 ways to define > a dependency: > - In a dialog > - Loading from xml file > So I think this should be checked there and then, and we can forget > about it elsewhere. > It was the XML-style that concerned me more. Actually, it could probably be handled at load time because dependencies would be added one by one. >>OK. But PERT/CPM will also have to tell whether the project is >>feasible. This is necessary eventually anyway. If there are no >>resources but a task needs some then it can't be done. What sort of >>information would be useful to the user? Maybe a list of tasks with >>unsatisfied constraints. > > I was thinking of error information stored in each node/resource, then > the ui can decide how to present it. > That is a good idea. The pert/cpm code still would not have to communicate directly to the interface. -- JDL Non enim propter gloriam, diuicias aut honores pugnamus set propter libertatem solummodo quam Nemo bonus nisi simul cum vita amittit.