Re: patch to add option to set schedulers by percentage

Steve Vinoski <[email protected]>
Newsgroups gmane.comp.lang.erlang.patches
Message-ID <CAO+zUOVPn5V_MGWrH_+jEghf-FUfWpbdG-UrSXBF2jPGZzaNDA@mail.gmail.com>
I've amended the commit on my branch as described in my previous message,
please refetch.

https://github.com/erlang/otp/pull/58

thanks,
--steve



On Thu, Aug 22, 2013 at 12:55 PM, Steve Vinoski <[email protected]> wrote:

> Hi Lukas,
>
> Thanks for the feedback. After our IRC conversation today covering the
> details of this issue, I agree it's clearer if this patch doesn't introduce
> order dependencies between +S and +SP options or introduce accumulated
> effects of multiple +SP options. I'll change my branch to do the following:
>
> * ensure that later +SP options on the command line completely replace any
> previous +SP options, so there's no accumulated effects between them (which
> implies "+SP 100:100" can undo any previous +SP options)
>
> * keep interactions between +S and +SP options, but remove ordering
> dependencies, thus your example "+S 16:16 +SP 50:50 +S 16:16" would result
> in [8:8] as you've specified, as would both "+SP 50:50 +S 16:16" and "+S
> 16:16 +SP 50:50"
>
> * document and add tests for the already-existing feature that +S 0:0
> undoes any prior +S options, resetting scheduler thread and scheduler
> thread online counts to their defaults for the host
>
> * document and add tests for the already-existing feature that specifying
> negative numbers for +S results in the specified values being subtracted
> from the scheduler thread and scheduler thread online counts
>
> I'll send another email when the branch is ready with these changes. Any
> other concerns, please let me know.
>
> thanks,
> --steve
>
>
>
> On Thu, Aug 22, 2013 at 10:11 AM, Lukas Larsson <[email protected]> wrote:
>
>>  Hello Steve,
>>
>> Have you given any thoughts on what should happen if you chain multiple
>> +SP commands? i.e.
>>
>> erl +S 16:16 +SP 50:50 +SP 50:50
>>
>> Our view right now is that this should give [8:8] and not [4:4] as it
>> currently does in the patch.
>>
>> Related to this we also do not think that the order to +S vs +SP commands
>> should matter. i.e.
>>
>> erl +S 16:16 +SP 50:50 +S 16:16
>>
>> should give [8:8] and not [16:16].
>>
>> What do you think? These things are for sure odd cases to think about,
>> but if it is possible someone will for sure do it....
>>
>> Lukas
>>
>>
>> On 21/08/13 15:45, Steve Vinoski wrote:
>>
>>  For applications where measurements show enhanced performance from the
>> use of a non-default number of emulator scheduler threads, having to
>> accurately set the right number of scheduler threads across multiple hosts
>> each with different numbers of logical processors is difficult because the
>> erl +S option requires absolute numbers of scheduler threads and scheduler
>> threads online to be specified.
>>
>>  To address this issue, this patch adds a +SP option to erl, similar to
>> the existing +S option but allowing the number of scheduler threads and
>> scheduler threads online to be set as percentages of logical processors
>> configured and logical processors available, respectively. For example,
>> "+SP 50:25" sets the number of scheduler threads to 50% of the logical
>> processors configured, and the number of scheduler threads online to 25% of
>> the logical processors available.
>>
>>  https://github.com/erlang/otp/pull/58
>>
>>  --steve
>>
>>
>> _______________________________________________
>> erlang-patches mailing [email protected]://erlang.org/mailman/listinfo/erlang-patches
>>
>>
>>
>

_______________________________________________
erlang-patches mailing list
[email protected]
http://erlang.org/mailman/listinfo/erlang-patches
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.