moving to 3.6beta
Doug Way <[email protected]> Thu, 3 Jul 2003 01:35:57 -0400
| Newsgroups | gmane.comp.lang.smalltalk.squeak.foundation |
|---|---|
| Message-ID | <[email protected]> |
The latest plan was to finally move to 3.6beta today, July 2nd. I think we are more or less ready featurewise, except that we could perhaps add the DecPools stuff which was approved. (The only reason I didn't already incorporate it is that it's a bit of a hassle to convert the .sar file to changesets, but it should be doable. Unless someone else wants to do this?) So, I think I should be able to add the DecPools stuff tomorrow (the 3rd), and the small handful of approved items. Then after that, we can move to beta tomorrow, and from then on we'll just add bug fixes. Does this sound reasonable? Also, Daniel and I talked (on this list) about not opening 3.7alpha yet, not until 3.6 moves to gamma, which I think is a good idea to make sure 3.6beta actually gets tested. (3.6gamma will be July 16) Anyway, I think we have 8 1/2 of the 11 items from the 3.6 plan done, so we're not doing too badly. (Plus DecPools would be an extra item not in the original plan.) It doesn't look like we'll have time to add Diego's look enhancements or Accufonts, but we can put them at the beginning of the 3.7 plan to make sure they don't get left out next time. - Doug