Re: moving to 3.6beta
[email protected] Thu, 03 Jul 2003 23:32:36 +0100
| Newsgroups | gmane.comp.lang.smalltalk.squeak.foundation |
|---|---|
| Message-ID | <[email protected]> |
Doug Way <[email protected]> wrote: > > The latest plan was to finally move to 3.6beta today, July 2nd. > > I think we are more or less ready featurewise, except that we could > perhaps add the DecPools stuff which was approved. (The only reason I > didn't already incorporate it is that it's a bit of a hassle to convert > the .sar file to changesets, but it should be doable. Unless someone > else wants to do this?) > > So, I think I should be able to add the DecPools stuff tomorrow (the > 3rd), and the small handful of approved items. Then after that, we can > move to beta tomorrow, and from then on we'll just add bug fixes. Does > this sound reasonable? Sounds dandy to me. > Also, Daniel and I talked (on this list) about not opening 3.7alpha > yet, not until 3.6 moves to gamma, which I think is a good idea to make > sure 3.6beta actually gets tested. (3.6gamma will be July 16) That is a good move. Linus tends to do the same. > Anyway, I think we have 8 1/2 of the 11 items from the 3.6 plan done, > so we're not doing too badly. (Plus DecPools would be an extra item > not in the original plan.) It doesn't look like we'll have time to add I agree. The date was more important than the list and we almost made the list. > Diego's look enhancements or Accufonts, but we can put them at the > beginning of the 3.7 plan to make sure they don't get left out next > time. Right. And as always - I *will* get SM1.1 out in july - even though that still means earliest second half july. I have been totally locked up with our wedding party, people staying with us since then and tomorrow morning I am going up north for some fishing and mosquito bites a week. When I get back I can put some heavy duty hacking onto it and finally get it done. > - Doug Great job guys, regards Göran