svn commit: r13696 - trunk/www/release_plan.html

[email protected]
Newsgroups gmane.comp.lang.uml.argouml.cvs
Message-ID <[email protected]>
Author: tfmorris
Date: 2007-10-29 16:35:31-0700
New Revision: 13696

Modified:
   trunk/www/release_plan.html

Log:
Add profile feature.  Spell check.

Modified: trunk/www/release_plan.html
Url: http://argouml.tigris.org/source/browse/argouml/trunk/www/release_plan.html?view=diff&rev=13696&p1=trunk/www/release_plan.html&p2=trunk/www/release_plan.html&r1=13695&r2=13696
==============================================================================
--- trunk/www/release_plan.html	(original)
+++ trunk/www/release_plan.html	2007-10-29 16:35:31-0700
@@ -11,7 +11,7 @@
 <h1>ArgoUML Release Plan</h1>
 
 <p>Even numbers are for stable versions. 
-The preceeding odd second number is the corresponding not so stable version.
+The preceding odd second number is the corresponding not so stable version.
 Example: 0.24 is a stable versions of 0.23.*. <br>
 0.24.1 is a stable bug fix release of 0.24.0. <br>
 Even releases are on the main branch (or extremely close to it).
@@ -34,6 +34,7 @@
 Planned date: ?
 </p>
 <ul>
+  <li>Profiles - User selectable modeling profiles (UML, Java, C++, user defined)
   <li>Allow diagram font + font size setting.
   <li>Hide/show for toolbars
   <li>Removed the "Preload Common Classes" setting
@@ -155,7 +156,7 @@
 Originally planned date: 2004-08-09
 <ul>
 <li>Methods, fields, and classes deprecated in 0.15 and 0.16 removed
-    (as always immediatly after a stable release).
+    (as always immediately after a stable release).
 <li>The zargo file format is changed due to addition of elements
 (Responsible: Michiel van der Wulp, Bob Tarling).
 </ul>
@@ -163,7 +164,7 @@
 <h3>ArgoUML release 0.17.2</h3>
 Published date: 2004-11-19.
 Released date: 2004-11-17.
-Orignally planned date: 2004-10-28
+Originally planned date: 2004-10-28
 <ul>
 <li>Swidgets library used.
 </ul>
@@ -212,7 +213,7 @@
 
 <h3>ArgoUML release 0.18.beta2</h3>
 Planned date: 2005-03-23
-<b>Release cancelled</b> - Nothing fixed since 0.18.beta1
+<b>Release canceled</b> - Nothing fixed since 0.18.beta1
 <p>
 Reasons to eventually do this are:
 <ul>
@@ -240,7 +241,7 @@
 <h3>ArgoUML release 0.18.1</h3>
 Planned date: 2005-04-30
 <ul>
-<li>Buggfix release.
+<li>Bugfix release.
 </ul>
 
 <h3>ArgoUML release 0.19.1</h3>
@@ -305,7 +306,7 @@
 </ul>
 
 <h3>ArgoUML release 0.19.8</h3>
-Originbally planned date: 2005-11-03
+Originally planned date: 2005-11-03
 Planned date: 2005-11-07
 Release date: 2005-11-08
 <ul>
@@ -360,7 +361,7 @@
 <ul>
   <li>This is a DEFECTs freeze release.
       We will only fix a selected set of serious problems found.
-      Linus Tolke determines which fixes that can be commited.
+      Linus Tolke determines which fixes that can be committed.
   <li>User Manual and Quick Guide can be fixed directly.
 </ul>
 
@@ -369,7 +370,7 @@
 <ul>
   <li>This is a DEFECTs freeze release.
       We will only fix a selected set of serious problems found.
-      Linus Tolke determines which fixes that can be commited.
+      Linus Tolke determines which fixes that can be committed.
   <li>User Manual and Quick Guide can be fixed directly.
 </ul>
 
@@ -481,9 +482,9 @@
 <a href="http://www.tigris.org/issues/show_bug.cgi?id=195">issue 195</a>.
 </p>
 <p>
-There is a big risk that any uncommited work will be lost or hard
+There is a big risk that any uncommitted work will be lost or hard
 to recover after this process so all developers shall make sure everything is
-commited (at least in a working branch).
+committed (at least in a working branch).
 After the conversion, any checked out CVS copy is useless and should be removed
 and a new check out using Subversion (SVN) is required.
 </p>
@@ -537,7 +538,7 @@
 Planned date: 2007-01-16
 </p>
 <ul>
-  <li>Bugg fixes only.
+  <li>Bug fixes only.
 </ul>
 
 <h3>ArgoUML release 0.24.alpha3</h3>
@@ -545,7 +546,7 @@
 Planned date: 2007-01-22
 </p>
 <ul>
-  <li>Bugg fixes only.
+  <li>Bug fixes only.
 </ul>
 
 
@@ -555,7 +556,7 @@
 </p>
 <ul>
   <li>Start of the beta period.
-  <li>Bugg fixes only.
+  <li>Bug fixes only.
   <li>List of known defects set!
   <li>Start of the quality assurance focus period
 </ul>
@@ -565,7 +566,7 @@
 Planned date: 2007-02-05
 </p>
 <ul>
-  <li>Only bugg fixes to bugs found during the quality assurance work.
+  <li>Only bug fixes to bugs found during the quality assurance work.
 </ul>
 
 <h3>ArgoUML release 0.24.beta3</h3>
@@ -574,7 +575,7 @@
 Originally planned date: 2007-02-09
 </p>
 <ul>
-  <li>Only bugg fixes to bugs found during the quality assurance work.
+  <li>Only bug fixes to bugs found during the quality assurance work.
 </ul>
 
 <h3>ArgoUML release 0.24</h3>
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.