svn commit: r15265 - trunk/www/release_plan.html
| Newsgroups | gmane.comp.lang.uml.argouml.cvs |
|---|---|
| Message-ID | <[email protected]> |
Author: linus Date: 2008-07-13 15:29:25-0700 New Revision: 15265 Modified: trunk/www/release_plan.html Log: Updated the release plan. Modified: trunk/www/release_plan.html Url: http://argouml.tigris.org/source/browse/argouml/trunk/www/release_plan.html?view=diff&rev=15265&p1=trunk/www/release_plan.html&p2=trunk/www/release_plan.html&r1=15264&r2=15265 ============================================================================== --- trunk/www/release_plan.html (original) +++ trunk/www/release_plan.html 2008-07-13 15:29:25-0700 @@ -48,9 +48,20 @@ Planned date: 2008-06-29 </p> +<h3>ArgoUML release 0.26.alpha2</h3> +<p> +Planned date: 2008-07-14 +</p> +<p> +This release replaces +the 0.26.beta1 release +that was originally planned for 2008-07-06 +because we are not ready to enter into beta. +</p> + <h3>ArgoUML release 0.26.beta1</h3> <p> -Planned date: 2008-07-06 +Planned date: 2008-07-22 </p> <ul> <li>Beginning of the beta period. @@ -68,14 +79,25 @@ <h3>ArgoUML release 0.26.beta2</h3> If necessary! <p> -Planned date: 2008-07-12 +Planned date: 2008-07-25 </p> <h3>ArgoUML release 0.26</h3> <p> -Planned date: 2008-07-19 +Planned date: 2008-07-27 </p> +<h3>Tigris site upgrade</h3> +<p> +Planned date: Monday 7/28/08 10:00 am IST +</p> +<p> +It is probably a good idea to have the release done before this starts +since there is a small risk that the site will be partially unavailable +or that some of the scripts run in the release will stop working because +something in the site has changed. There shouldn't be such dependencies +in the scripts but we should never say never. +</p> </div>