svn commit: r16389 - trunk/www/release_plan.html
Tom Morris <[email protected]>
| Newsgroups | gmane.comp.lang.uml.argouml.cvs |
|---|---|
| Message-ID | <[email protected]> |
Author: tfmorris
Date: 2008-12-19 13:41:39-0800
New Revision: 16389
Modified:
trunk/www/release_plan.html
Log:
Put current planned dates first so they get noticed. Move historic releases to the wiki.
Modified: trunk/www/release_plan.html
Url: http://argouml.tigris.org/source/browse/argouml/trunk/www/release_plan.html?view=diff&pathrev=16389&r1=16388&r2=16389
==============================================================================
--- trunk/www/release_plan.html (original)
+++ trunk/www/release_plan.html 2008-12-19 13:41:39-0800
@@ -10,24 +10,10 @@
<h1>ArgoUML Release Plan</h1>
-<p>Even numbers are for stable versions.
-The preceding odd second number is the corresponding not so stable version.
-Example: 0.24 is a stable versions of 0.23.*. <br>
-0.24.1 is a stable bug fix release of 0.24.0. <br>
-Even releases are on the main branch (or extremely close to it).
-The main branch is always working towards the future.</p>
-
-<p>
-Releases will only be made when there are no failing tests.
-The purpose of this is to avoid any confusing discussion about
-what tests were failing or are supposed to be failing and replace it
-with the clear facts, if a test was
-"included in a release"/"tagged with the release tag",
-that test succeeded for that release.
<div class="h2">
-<h2>Upcoming releases</h2>
+<h2>Planned releases</h2>
<div class="h3">
<h3>ArgoUML release 0.27.1</h3>
@@ -41,16 +27,14 @@
<li>Move the User Manual out of the main project and into
the argouml-documentation project.
<li>Move java support to separate module.
-<li>The work above is completed and about to be merged so don't do
- simple code-improvements until the merging is done to avoid
- complicating the merge work.
</ul>
</div>
<div class="h3">
<h3>Tigris site upgrade</h3>
<p>
-Planned date: November 11th through 17th
+Actual: 2008-12-02
+Previous planned date: November 11th through 17th
</p>
</div>
@@ -66,8 +50,8 @@
<div class="h3">
<h3>ArgoUML release 0.27.2</h3>
<p>
-Planned date: 2008-11-18<br>
-New planned date: 2008-11-20
+Actual: 2008-11-22<br>
+Previous planned date: 2008-11-18
</p>
<ul>
<li>Csharp source import (Thilina Hasanthas GSoC work).
@@ -94,8 +78,8 @@
<div class="h3">
<h3>ArgoUML release 0.28.ALPHA_1</h3>
<p>
-Planned date: 2008-11-12<br>
-New planned date: 2008-12-29
+Planned date: 2008-12-29<br>
+Original planned date: 2008-11-12
</p>
<ul>
<li>Start of alpha period.
@@ -105,8 +89,8 @@
<div class="h3">
<h3>ArgoUML release 0.28.ALPHA_2</h3>
<p>
-Planned date: 2008-11-18<br>
-New planned date: 2009-01-03
+Planned date: 2009-01-03<br>
+Original planned date: 2008-11-18
</p>
<ul>
<li>?
@@ -116,8 +100,8 @@
<div class="h3">
<h3>ArgoUML release 0.28.ALPHA_3</h3>
<p>
-Planned date: 2008-11-24<br>
-New planned date: 2009-01-08
+Planned date: 2009-01-08<br>
+Original planned date: 2008-11-24
</p>
<ul>
<li>?
@@ -127,8 +111,8 @@
<div class="h3">
<h3>ArgoUML release 0.28.BETA_1</h3>
<p>
-Planned date: 2008-11-29<br>
-New planned date: 2009-01-15
+Planned date: 2009-01-15<br>
+Original planned date: 2008-11-29
</p>
<ul>
<li>Start of beta period.
@@ -142,8 +126,8 @@
<div class="h3">
<h3>ArgoUML release 0.28</h3>
<p>
-Planned date: 2008-12-11<br>
-New planned date: 2009-01-27
+Planned date: 2009-01-27<br>
+Original planned date: 2008-12-11
</p>
<ul>
<li>Stable release.
@@ -168,763 +152,8 @@
<h2>Historic releases</h2>
-<h3>ArgoUML release 0.14</h3>
-Date: 2003-08-17
-
-<h3>ArgoUML release 0.14.1</h3>
-Date: 2003-08-22
-<ul>
-<li>Small fix to allow to run 0.14 from Java Web Start
-</ul>
-
-<h3>ArgoUML release 0.15.1</h3>
-Planned date: 2003-09-10
-<ul>
-<li>Toolbar implemented using Toolbar library (Responsible: Bob Tarling)
-</ul>
-
-<h3>ArgoUML release 0.15.2</h3>
-Real date: 2003-11-26
-<ul>
-<li>Working Java Web Start. (Responsible: Linus Tolke)
-<li>New Explorer implementation. (Responsible: Alex Bagehot)
-<li>Activity diagrams are working again.
-<li>Zoom slider.
-<li>Ordering tree items in the Explorer.
-</ul>
-
-<h3>ArgoUML release 0.15.3</h3>
-New planned date: 2004-01-31
-Actually released on: 2004-02-05
-<ul>
-<li>New version of GEF (0.10). (Responsible: Bob Tarling)
-<li>New version of i18n (0.1.3). (Responsible: Jean-Hugues de Raigniac)
-<li>Organizing the languages differently. (Responsible: Linus Tolke)
-<li>Checklists enabled again. (Responsible: Linus Tolke)
-</ul>
-
-<h3>ArgoUML release 0.15.4</h3>
-Real date: 2004-03-01
-
-<h3>ArgoUML release 0.15.5</h3>
-Real date: 2004-04-20
-<ul>
-<li>New PHP code generator for PHP4 and PHP5 (Responsible: Kai Schr?öder)
-<li>First suggestion at sending non-NSUML events from the Model subsystem.
-</ul>
-
-<h3>ArgoUML release 0.15.6</h3>
-New planned date: 2004-05-20
-Originally planned date: 2004-05-18
-<ul>
-<li>New version of GEF.
-</ul>
-
-<h3>ArgoUML release 0.16.alpha1</h3>
-Planned date: 2004-06-21
-Actual date: 2004-06-22
-Announced: 2004-06-27
-<ul>
-<li>This is the feature freeze point. After this, only DEFECTs can be fixed.
-</ul>
-
-<h3>ArgoUML release 0.16.alpha2</h3>
-Originally planned date: 2004-07-01
-Planned date: 2004-07-04 (21-23 Swedish time).
-Actual date: 2004-07-05 (00-01 Swedish time).
-<ul>
-<li>Not working Sequence diagrams disabled so nobody will try them.
-<li>This is the feature freeze release. Only DEFECTs can be fixed.
-</ul>
-
-<h3>ArgoUML release 0.16.beta1</h3>
-Planned date: 2004-07-09
-<ul>
-<li>This is the DEFECTs freeze point.
- The list of known problems is compiled and the quality assurance work
- left is only with the already RESOLVED issues.
-</ul>
-
-<h3>ArgoUML release 0.16</h3>
-Date: 2004-07-17<p>
-Originally planned date: 2004-07-21<p>
-Stable release.
-<ul>
-<li>Sequence diagrams not fixed disabled.
-<li>NS-UML still required.
-</ul>
-
-<h3>ArgoUML release 0.16.1</h3>
-Planned date: 2004-08-17<p>
-Real date: 2004-09-04<p>
-Stable release.
-<ul>
-<li>Same as 0.16 except for a fix to issue 2718 (2731).
-</ul>
-
-<h3>ArgoUML release 0.17.1</h3>
-Real date: 2004-09-30
-Planned date: 2004-09-30
-Originally planned date: 2004-08-09
-<ul>
-<li>Methods, fields, and classes deprecated in 0.15 and 0.16 removed
- (as always immediately after a stable release).
-<li>The zargo file format is changed due to addition of elements
-(Responsible: Michiel van der Wulp, Bob Tarling).
-</ul>
-
-<h3>ArgoUML release 0.17.2</h3>
-Published date: 2004-11-19.
-Released date: 2004-11-17.
-Originally planned date: 2004-10-28
-<ul>
-<li>Swidgets library used.
-</ul>
-
-<h3>ArgoUML release 0.17.3</h3>
-Planned date: 2004-12-30
-<ul>
-<li>New persistence mechanism.
-</ul>
-
-<h3>ArgoUML release 0.17.4</h3>
-Planned date: 2005-01-02
-
-<h3>ArgoUML release 0.17.5</h3>
-Originally planned date: 2005-02-01
-Planned date: 2005-02-13
-
-<h3>ArgoUML release 0.18.alpha1</h3>
-Planned date: 2005-02-23
-<ul>
-<li>This is the feature freeze point. After this, only DEFECTs can be fixed.
-</ul>
-
-<h3>ArgoUML release 0.18.alpha2</h3>
-Planned date: 2005-03-02
-<ul>
-<li>This is a feature freeze release. Only DEFECTs can be fixed.
-</ul>
-
-<h3>ArgoUML release 0.18.alpha3</h3>
-Planned date: 2005-03-10
-<ul>
-<li>This is a feature freeze release. Only DEFECTs can be fixed.
-<li>Patched version of GEF.
-</ul>
-
-<h3>ArgoUML release 0.18.beta1</h3>
-Planned date: 2005-03-16
-Release date: 2005-03-20
-<ul>
-<li>This is the DEFECTs freeze point.
- The list of known problems is compiled and the quality assurance work
- left is only with the already RESOLVED issues.
-<li>GEF 0.10.14. (hopefully)
-</ul>
-
-<h3>ArgoUML release 0.18.beta2</h3>
-Planned date: 2005-03-23
-<b>Release canceled</b> - Nothing fixed since 0.18.beta1
-<p>
-Reasons to eventually do this are:
-<ul>
-<li>To verify that GEF 0.10.14 is working correctly?
-<li>If there are problems found in the verification of issues that are
- solved and we are not 100% sure of the solution.
-</ul>
-
-<h3>ArgoUML release 0.18.beta2</h3>
-Planned date: 2005-03-30
-Real date: 2005-04-03
-<ul>
-<li>To verify that GEF 0.10.14 is working correctly?
-<li>Issue 3172 resolved.
-</ul>
-
-<h3>ArgoUML release 0.18</h3>
-Originally Planned date: 2005-04-03
-New Planned date: 2005-04-12
-<ul>
-<li>Stable release.
-<li>Last NS-UML version of ArgoUML runnable.
-</ul>
-
-<h3>ArgoUML release 0.18.1</h3>
-Planned date: 2005-04-30
-<ul>
-<li>Bugfix release.
-</ul>
-
-<h3>ArgoUML release 0.19.1</h3>
-Planned date: 2005-05-08
-<ul>
-<li>Model subsystem with the MDR/JMI implementation.
-<li>Build scripts for building the MDR implementation in place.
-</ul>
-Once the MDR/JMI implementation is working we will drop NS-UML.
-
-<h3>ArgoUML release 0.19.2</h3>
-Planned date: 2005-06-08
-Released date: 2005-06-10
-<ul>
-<li>First non-NS-UML version of ArgoUML startable.
- The MDR solution is actually not included in this release (it doesn't work
- well enough).
-</ul>
-
-<h3>ArgoUML release 0.19.3</h3>
-Planned date: 2005-07-08
-<br>
-Released date: 2005-07-20
-<ul>
- <li>Undo partially working
- <li>Popup windows for multiple selections.
- <li>MDR version of ArgoUML able to create objects on diagrams.
- The MDR solution is actually not included in this release (it doesn't work
- well enough).
-</ul>
-
-<h3>ArgoUML release 0.19.4</h3>
-Planned date: 2005-08-20
-
-<h3>ArgoUML release 0.19.5</h3>
-Planned date: 2005-09-20
-<ul>
- <li>MDR version of ArgoUML:
- <ul>
- <li>Shipped with base dist
- <li>Starts via a shell script/bat...
- <li>Loading/saving working
- </ul>
-</ul>
-
-<h3>ArgoUML release 0.19.6</h3>
-Planned date: 2005-09-26
-<ul>
- <li>MDR version of ArgoUML:
- <ul>
- <li>Starts via a shell script/bat...
- <li>Works also with Java5.
- </ul>
-</ul>
-
-<h3>ArgoUML release 0.19.7</h3>
-Originally planned date: 2005-10-20
-New planned date: 2005-10-27
-<ul>
- <li>MDR is made the default storage.
- <li>GEF 0.11.2 included.
-</ul>
-
-<h3>ArgoUML release 0.19.8</h3>
-Originally planned date: 2005-11-03
-Planned date: 2005-11-07
-Release date: 2005-11-08
-<ul>
- <li>NSUML is removed.
-</ul>
-
-<h3>ArgoUML release 0.20.alpha1</h3>
-Planned date: 2005-11-13
-<ul>
- <li>Feature freeze - from this point, only DEFECTs can be fixed.
-</ul>
-
-<h3>ArgoUML release 0.20.alpha2</h3>
-Planned date: 2005-11-20
-<ul>
- <li>This is a feature freeze release. Only DEFECTs can be fixed.
-</ul>
-
-<h3>ArgoUML release 0.20.alpha3</h3>
-Planned date: 2005-11-30
-<ul>
- <li>This is a feature freeze release. Only DEFECTs can be fixed.
-</ul>
-
-<h3>ArgoUML release 0.20.alpha4</h3>
-Planned date: 2005-12-05
-<ul>
- <li>This is a feature freeze release. Only DEFECTs can be fixed.
-</ul>
-
-<h3>ArgoUML release 0.20.alpha5</h3>
-Originally Planned date: 2005-12-15
-Planned date: 2006-01-04
-<ul>
- <li>This is a feature freeze release. Only DEFECTs can be fixed.
-</ul>
-
-<h3>ArgoUML release 0.20.beta1</h3>
-Originally Planned date: 2005-12-11
-Planned date: 2006-01-11
-News item at: 2006-01-19
-Announcing mail at: 2006-01-21
-<ul>
- <li>This is a feature freeze release. Only DEFECTs can be fixed.
- <li>This is the DEFECTs freeze point - at this point, the list of
- known DEFECTs is compiled and only DEFECTs that are reopened
- because of the verification can be fixed.
-</ul>
-
-<h3>ArgoUML release 0.20.beta2</h3>
-Planned date: 2006-01-26
-<ul>
- <li>This is a DEFECTs freeze release.
- We will only fix a selected set of serious problems found.
- Linus Tolke determines which fixes that can be committed.
- <li>User Manual and Quick Guide can be fixed directly.
-</ul>
-
-<h3>ArgoUML release 0.20.beta3</h3>
-Planned date: 2006-01-31
-<ul>
- <li>This is a DEFECTs freeze release.
- We will only fix a selected set of serious problems found.
- Linus Tolke determines which fixes that can be committed.
- <li>User Manual and Quick Guide can be fixed directly.
-</ul>
-
-<h3>ArgoUML release 0.20</h3>
-Originally Planned date: 2005-12-14
-Planned date: 2006-02-08
-<ul>
- <li>Sequence diagrams
- <li>Fully working MDR solution
-</ul>
-
-<h3>ArgoUML release 0.21.1</h3>
-Planned date: 2006-03-21
-<ul>
- <li>First release towards 0.22.
- <li>All internationalizations included from separate projects.
- <li>argouml-mdr project included into main project.
- <li>first attempt at new release process.
-</ul>
-
-<h3>ArgoUML release 0.21.2</h3>
-Originally Planned date: 2006-04-15<br>
-Planned date: 2006-04-20
-<ul>
- <li>RE/CG for cpp, idl, classfile, and php included from separate projects.
- <li>?
-</ul>
-
-<h3>ArgoUML release 0.21.3</h3>
-Originally planned date: 2006-05-20<br>
-New planned date: 2006-06-06 (Swedish National Holiday!)
-<ul>
- <li>modules file no longer used, instead everything packaged into
- the main zip and tar archives.
-</ul>
-
-<h3>ArgoUML release 0.22.alpha1</h3>
-Planned date: 2006-06-13<br>
-Originally planned date: 2006-04-26<br>
-This is deferred now because we are discussing if we shall attempt
-at a more speedy release schedule.
-<ul>
- <li>Entering alpha.
-</ul>
-
-<h3>ArgoUML release 0.22.alpha2</h3>
-New planned date: 2006-06-18<br>
-Originally planned date: 2006-05-31
-<ul>
- <li>Second alpha.
-</ul>
-
-<h3>ArgoUML release 0.22.alpha3</h3>
-Date: 2006-06-29<br>
-
-<h3>ArgoUML release 0.22.alpha4</h3>
-Date: 2006-07-09<br>
-
-<h3>ArgoUML release 0.22.beta1</h3>
-New planned date: 2006-07-15<br>
-Originally planned date: 2006-06-05
-<ul>
- <li>Entering beta.
-</ul>
-
-<h3>ArgoUML release 0.22.beta2</h3>
-New planned date: 2006-07-18<br>
-Originally planned date: 2006-06-08
-<ul>
- <li>Second beta.
-</ul>
-
-<h3>ArgoUML release 0.22.beta3</h3>
-<p>
-New planned date: 2006-07-26<br>
-Originally planned date: 2006-07-21
-</p>
-<ul>
- <li>Third beta.
-</ul>
-
-<h3>ArgoUML release 0.22</h3>
-<p>
-New planned date: 2006-08-08<br>
-Original planned date: 2006-05-15
-</p>
-<ul>
- <li>Stable release.
-</ul>
-
-
-<h3>ArgoUML release 0.23.1</h3>
-<p>
-Planned date: 2006-09-09
-</p>
-<ul>
- <li>First step towards a split-model repository
- (<a href="/issues/show_bug.cgi?id=3497">issue 3497</a>).
- <li>New key for signing the jar files.
- The old one expires November 13:th 2006.
-</ul>
-
-<h3>Conversion of the ArgoUML projects to Subversion</h3>
-<p>
-Originally Planned date: 2006-09-10 (immediately after 0.23.1)<br>
-Planned date set by the staff that is actually going to do it:
-2006-09-17 through 2006-09-28 depending on the project.
-For details see
-<a href="http://www.tigris.org/issues/show_bug.cgi?id=195">issue 195</a>.
-</p>
-<p>
-There is a big risk that any uncommitted work will be lost or hard
-to recover after this process so all developers shall make sure everything is
-committed (at least in a working branch).
-After the conversion, any checked out CVS copy is useless and should be removed
-and a new check out using Subversion (SVN) is required.
-</p>
-
-<h3>ArgoUML release 0.23.2</h3>
-<p>
-Planned date: 2006-09-28 (immediately after change to subversion).
-</p>
-<ul>
- <li>First release from a subversion repository.
-</ul>
-
-<h3>ArgoUML release 0.23.3</h3>
-<p>
-Planned date: 2006-10-27
-</p>
-<ul>
- <li>Signed with new key.
-</ul>
-
-<h3>ArgoUML release 0.23.4</h3>
-<p>
-Planned date: 2006-12-10<br>
-Old planned date: 2006-11-27
-</p>
-<ul>
- <li>The source import / reverse engineering interfaces refactored to be
- GUI independent.
-</ul>
-
-<h3>ArgoUML release 0.23.5</h3>
-<p>
-Planned date: 2007-01-04<br>
-</p>
-<ul>
- <li>Release process maintains subclipse:tags.
- <li>?
-</ul>
-
-<h3>ArgoUML release 0.24.alpha1</h3>
-<p>
-Planned date: 2007-01-10
-</p>
-<ul>
- <li>Enhancement freeze point.
- <li>Start of the alpha period.
-</ul>
-
-<h3>ArgoUML release 0.24.alpha2</h3>
-<p>
-Planned date: 2007-01-16
-</p>
-<ul>
- <li>Bug fixes only.
-</ul>
-
-<h3>ArgoUML release 0.24.alpha3</h3>
-<p>
-Planned date: 2007-01-22
-</p>
-<ul>
- <li>Bug fixes only.
-</ul>
-
-
-<h3>ArgoUML release 0.24.beta1</h3>
-<p>
-Planned date: 2007-01-29
-</p>
-<ul>
- <li>Start of the beta period.
- <li>Bug fixes only.
- <li>List of known defects set!
- <li>Start of the quality assurance focus period
-</ul>
-
-<h3>ArgoUML release 0.24.beta2</h3>
-<p>
-Planned date: 2007-02-05
-</p>
-<ul>
- <li>Only bug fixes to bugs found during the quality assurance work.
-</ul>
-
-<h3>ArgoUML release 0.24.beta3</h3>
-<p>
-Planned date: 2007-02-08<br>
-Originally planned date: 2007-02-09
-</p>
-<ul>
- <li>Only bug fixes to bugs found during the quality assurance work.
-</ul>
-
-<h3>ArgoUML release 0.24</h3>
-<p>
-Planned date: 2007-02-12
-</p>
-<ul>
- <li>No changes since 0.24.beta3 (virtually).
-</ul>
-
-<h3>ArgoUML release 0.25.1</h3>
-<p>
-Planned date: 2007-03-01
-</p>
-<ul>
- <li>Support for JDK1.4 dropped.
- <li>Drag & Drop in explorer for features. Drag moves. Ctrl-drag copies.
-</ul>
-
-<h3>ArgoUML release 0.25.2</h3>
-<p>
-Date: 2007-04-10
-</p>
-<ul>
- <li>CTRL-drag now copies items in the explorer.
- <li>Improved "Show name of nodes in bold font".
- <li>Added property panel for ElementImport.
-</ul>
-
-<h3>ArgoUML release 0.25.3</h3>
-<p>
-Date: 2007-05-23
-</p>
-<ul>
- <li>Removed from publication, due to severe malfunctions.
- <li>Actors and most other classifiers are now allowed in static structure (class)
-diagrams.
- <li>Objects and a few other Instances are now allowed in static structure (class)
-diagrams.
- <li>Java import support for enum.
- <li>ObjectFlowState properties panel improvements.
- <li>Some work for Partitions (Swimlanes) was done - but not activated yet.
-</ul>
-
-<h3>ArgoUML release 0.25.4</h3>
-<p>
-Planned date: 2007-12-13
-</p>
-<ul>
- <li>Profiles - User selectable modeling profiles (UML, Java, C++, user defined)
- <li>Allow diagram font + font size setting.
- <li>Hide/show for toolbars
- <li>Removed the "Preload Common Classes" setting
- <li>Progress bar in save and load.
-</ul>
-
-<h3>Flag day for renaming the directories in src</h3>
-<p>
-Planned date: 2008-04-20 (agreed, Dave Thompson, see
-<a href="http://argouml.tigris.org/issues/show_bug.cgi?id=4625">issue
-#4625</a>, and
-<a href="http://argouml.tigris.org/servlets/ReadMsg?list=dev&msgNo=22088">this
-email</a>).
-</p>
-<p>
-Since the directories in src are renamed this will affect
-everyone's work spaces. They have to be refetched.
-</p>
-
-<h3>GSoC Students announced</h3>
-<p>
-Planned date from Google SoC timeline: 2008-04-21.
-</p>
-<p>
-This is the start of the Community Bonding Period where:
-"Students get to know mentors, read documentation,
-get up to speed to begin working on their projects."
-</p>
-
-<h3>ArgoUML release 0.25.5</h3>
-<p>
-Date: 2008-05-11
-</p>
-<ul>
-<li>All P1 issues (especially 4946) must be solved.
-<li>New directory names.
-</ul>
-
-<h3>ArgoUML release 0.25.6</h3>
-<p>
-Planned date: 2008-06-14
-</p>
-
-<h3>ArgoUML release 0.26.alpha1</h3>
-<p>
-Planned date: 2008-06-23
-</p>
-<ul>
-<li>Beginning of the alpha period.
- From this point on, it is only allowed to commit solutions to defects
- in the trunk for all of the involved project.
- State the issue number of the defect in the commit message.
- </li>
-<li>Solution to build script and module loading problems for the new sequence
- diagrams and the c++ module.</li>
-</ul>
-
-<h3>ArgoUML release 0.26.alpha2</h3>
-<p>
-Planned date: 2008-06-29
-</p>
-
-<h3>ArgoUML release 0.26.alpha3</h3>
-<p>
-Planned date: 2008-07-14
-</p>
-<p>
-This release replaces
-the 0.26.beta1 release
-that was originally planned for 2008-07-06
-because we are not ready to enter into beta.
-</p>
-
-</div>
-
-<div class="h3">
-<h3>ArgoUML release 0.26.alpha4</h3>
-<p>
-Planned date: 2008-08-02
-</p>
-<p>
-If all P1 issues are not solved, this will be further delayed.
-</p>
-<ul>
-<li>All P1 issues must be solved.</li>
-</ul>
-</div>
-
-<div class="h3">
-<h3>ArgoUML release 0.26.alpha5</h3>
-<p>
-Planned date: 2008-08-26
-</p>
-</div>
-
-<div class="h3">
-<h3>ArgoUML release 0.26.beta1</h3>
-<p>
-Planned date: 2008-08-31
-</p>
-<p>
-If there are remaining P2 issues
-this will be converted to an alpha release.
-</p>
-<ul>
-<li>Beginning of the beta period.
- From this point on, it is not allowed to commit solutions to open issues
- in the trunk for any of the involved project.
- The release manager, Linus Tolke,
- grants permission exceptions (i.e. for all commits in trunk).
- </li>
-
-<li>A known problems list is compiled.</li>
-
-<li>All P1 and P2 issues must be solved.</li>
-</ul>
-</div>
-
-<div class="h3">
-<h3>ArgoUML release 0.26.beta2</h3>
-<p>
-Planned date: 2008-09-09
-</p>
-<ul>
-<li>If needed.
-</ul>
-</div>
-
-<div class="h3">
-<h3>ArgoUML release 0.26.beta3</h3>
-<p>
-Planned date: 2008-09-13
-</p>
-<p>
-This release was not performed.
-</p>
-</div>
-
-<div class="h3">
-<h3>ArgoUML release 0.26.beta3</h3>
-<p>
-New release planned.
-</p>
-<p>
-Planned date: 2008-09-18
-</p>
-<ul>
-<li>Issue 5384.
-<li>Issue 5389.
-<li>Issue 5393.
-<li>Issue 5395.
-<li>Issue 5388.
-</ul>
-</div>
-
-<div class="h3">
-<h3>ArgoUML release 0.26.beta4</h3>
-<p>
-New release planned.
-</p>
-<p>
-Planned date: 2008-09-21
-</p>
-<ul>
-<li>Issue 5360.
-</ul>
-</div>
-
-<div class="h3">
-<h3>ArgoUML release 0.26.beta5</h3>
-<p>
-New release planned.
-</p>
-<p>
-Planned date: 2008-09-24
-</p>
-<ul>
-<li>Issue 5402.
-</ul>
-</div>
-
-<div class="h3">
-<h3>ArgoUML release 0.26</h3>
-<p>
-Planned date: 2008-09-27
-</p>
-</div>
+See the <a href="http://argouml.tigris.org/wiki/ReleaseSchedule">wiki for
+previous release dates</a>.
<hr>
Last modified $Date$.
------------------------------------------------------
http://argouml.tigris.org/ds/viewMessage.do?dsForumId=5905&dsMessageId=987831
To unsubscribe from this discussion, e-mail: [[email protected]].