Re: Soil Contact Issue

"[email protected] [Abaqus]" <[email protected]> 15 Dec 2018 22:40:33 +0000
Newsgroups gmane.comp.mathematics.abaqus.user
Message-ID <[email protected]>
Hello Sven,
 

 Replace the lines 17870-17872 in the input file Job_08.inp with the following:
 

 *Step, name=Step_Geostatic, nlgeom=NO, inc=100000
*Geostatic, utol
0.01, 1., 1e-07, 1.

Actually, this replacement reduces the time step size by 100 and increases the number of maximum increments. In addition, replace the line 17864 in the input file Job_08.inp with the following:
 

 *Contact Pair, interaction=IntPropFric08, small sliding, type=SURFACE TO SURFACE, adjust=0.01


 I have run the Abaqus input file with these modifications and the results are below:
 

 https://ufile.io/aeu26 https://ufile.io/aeu26

 https://ufile.io/aeu26

 Best regards,
 

 _______________________________________________
George Papazafeiropoulos
Captain, Infrastructure Engineer, Hellenic Air Force
Civil Engineer, M.Sc., Ph.D. candidate, NTUA
Email: [email protected]