Re: How to apply initial stress
[email protected] Wed, 18 Aug 2010 19:14:53 +0900
| Newsgroups | gmane.comp.mathematics.tochnog.user |
|---|---|
| Message-ID | <[email protected]> |
Hi, If ground surface is level, initial stress can be given by following commands. control_data_put control_data_put_double_node After that, if ups and downs are shown in a ground surface, the ground can be deleted by next command. control_mesh_delete_geometry Please refer to following address. http://tochnog.sourceforge.net/slope.html TANAKA Minoru >Hi everybody, > I want to analysis a tunnel model by Tochnog, but I not sure how to apply the initial stress(stress exist before excavation, in-situ stress), by keyword "node_dof" with correct dof lable ? Or "control_unknown_reset_unknown" accompany with "control_unknown_reset_value"? > Did someone analyze similarly? Any suggestion will be appreciated. Thanks in advance. >Joe Seung ------------------------------------------------------------------------------ This SF.net email is sponsored by Make an app they can't live without Enter the BlackBerry Developer Challenge http://p.sf.net/sfu/RIM-dev2dev