Newby - all check tests fail...

Bob Gustafson <[email protected]>
Newsgroups gmane.comp.mobile.kannel.devel
Message-ID <v04020a0abb18d094c7bc@[192.168.49.19]>
Hi

I have a RedHat 9.0 system, I downloaded and compiled the latest release
tarball, did all (??) the instructed tasks - and got the check-date line
with FAILURE and then the checks hung (overnight - still hung).

Then I did a co fron cvs and repeated the above and got the same results.

If I open another window and do a 'ps ax' to find the pid of the running
processes, and then do a 'kill -TERM <test.pid> for each of the sub tests,
it looks like there is stuff running. The servers are up with gw/xxx config
files, but the test harness itself seems to just hang.

Any thoughts?

BobG


-------

My config is

[root@hoho2 gateway-1.3.1]# more conf.rdg.sh

./configure  --enable-pam \
             --enable-localtime \
             --enable-mutex-stats \
             --enable-cookies \
             --enable-start-stop-daemon  \
             --disable-ssl-thread-test \
             --enable-ssl \
             --enable-mysql \
2>&1 | tee config.out
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.