Re: [Mac OS X / X11 ] Proposition of baseline for 2.0 and 2.0.1

James McKenzie <[email protected]> Sat, 17 Sep 2005 14:50:49 -0700
Newsgroups gmane.comp.openoffice.devel.porting
Message-ID <[email protected]>
Tino Rachui wrote:

> James McKenzie wrote:
>
>> Pavel:
>>  
>> Here is what I propose.  We work on and fix as much of the problems 
>> with the 1.1 series.  
>
>
> Well James if "We" includes yourself too would you then take the time 
> to really contribute to what you have suggested?
>
I will.  I have a signed JCA and I will get it to Sun.

>> There are notable problems building 1.1.5 on MacOSX Tiger that have 
>> NOT been merged back into the master through child work spaces.   
>
>
> As I said feel free to get things done if you think they are important.
>
Thank you.  I think that we need to fix things on a release version to 
fix bugs or bring in additional functionality. 

And I do agree that we need to get moving on 2.0 to get it to a release 
candidate or, hopefully, a release in the next few weeks or months.  It 
is truely behind schedule.

James McKenzie