Re: BPCS 6.1 - Switch from Pick Confirm to Ship Confirm
Tim Knoebel <[email protected]>
| Newsgroups | gmane.comp.systems.as400.bpcs |
|---|---|
| Message-ID | <BN1PR06MB085F5AC28C10A70697DB81CC5C40@BN1PR06MB085.namprd06.prod.outlook.com> |
We do have big lags between pick confirm and the actual shipment of the order due to procedural issues - the problem areas have been identified but no movement in shipping department to rectify the issues. So now the system must be modified to accommodate the procedural issues instead of fixing the personnel issues. Go figure. Thanks DeeDee. Best regards, Timothy J Knoebel, Sr. iSeries/BPCS Administrator GSG Fastebers dba Scovill Fasteners . 1802 Scovill Drive . Clarkesville, GA 30523 . USA . scovill.com MAIN 1-888-726-8455 EXT. 522 | DIRECT 706-754-0522 | EMAIL [email protected] -----Original Message----- From: BPCS-L [mailto:bpcs-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]] On Behalf Of DeeDee Virgei Sent: Monday, May 18, 2015 12:30 To: BPCS ERP System Subject: Re: [BPCS-L] BPCS 6.1 - Switch from Pick Confirm to Ship Confirm No problem. We are in the process of converting from 4.05CD to LX and plan to mostly use base order class 15. It works similar to 4 as far as inventory goes, where the "B" is generated at the 'confirm' process just prior to invoicing (Infor labeled it Pick/Ship Confirm). I don't know if 15 is offered in V6 and probably not a viable solution anyways (we are using it for OLM purposes)... I ran a quick test on class 5, where you have two confirm steps, i.e., a pick confirm, then a ship confirm. In my test the "B" was done at the pick confirm, so again, not a viable solution :(. Unless there is a system or other parameter somewhere where you could have the "B" done at ship confirm for class 5... Are your shipments with long lags/delays export orders? Just curious... Good luck Timothy! Best Regards, DeeDee Virgei Project Manager Office: 440-329-0487; Cell: 440-670-3331 Nelson Stud Welding, Inc. 440-329-0400 A DONCASTERS Group Limited Company -- This is the BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l.