Re: Create PO from SO / mess memories
"Alister Wm Macintyre \(Wow\)" <[email protected]>
| Newsgroups | gmane.comp.systems.as400.bpcs |
|---|---|
| Message-ID | <00ce01d0c557$e6d108f0$b4731ad0$@com> |
No, but any discussion of messes perhaps belongs on a separate thread off-line, since it may not serve the needs of other BPCS-L users. Some horrors I have witnessed in manufacturing: * BPCS has known bugs. Conversion software, from one version to another, also has bugs, and does not get the repair attention of BPCS itself. * BPCS labels the PO to AP process as 3-way match. I call it 3-way mismatch, because there are multiple scenarios where we can end up paying a vendor multiple times for the identical purchase. The same works on the CO AR side, where customers can get away with not paying for years, because the system only works if management understands the BPCS accounting system, and monitors what's going on. That combination is often lacking. An ERP works effectively if all ingredients have a high degree of accuracy. Attention is often focused on engineering and inventory, ignoring other areas, for which the same truism applies. Auditors only catch problems in areas they are asked to check, and they are not asked to check areas where the bosses cannot imagine anything significant can go wrong. Occasionally when we have new auditors, I inform them that BPCS is embezzlement-friendly, and if they wish, I can explain how. * The only documentation, for modifications, is what someone like me puts inside modified programs . WHY are we doing this, in which I incorporate /COPY some cross-index lists of all programs involved in each modification package. There's very little there which is non-tech intelligible. This is a potential problem because personnel cut-backs make it no longer practical to provide ERP education for new hires, who are relying on the vanilla BPCS documentation, such as it is, and with the personnel cut-backs, future quality thorough testing becomes impractical. Most mods are rush jobs to meet a particular scenario, not tested on all possible permutations, because they are not relevant to current operations, but business needs change, new untrained personnel experiment with other scenarios, so we have time bombs ahead. * Over time, we figure out what is safe to be on corporate network, what not, optimize firewall, make sure QSECOFR does NOT have BPCS access, so that if anything goes wrong in BPCS security settings, we can use QSECOFR to undo the damage. Then Management calls in some outside contractors, gives them the keys to the castle, orders IT to stand aside, and the outside contractors undo all our careful security work, not because that was what they were hired to do, but because the security interfered with what they were trying to accomplish. Their BPCS modifications are totally undocumented, and violate our standards. For example, a past administrator had asked that any patch, upgrade, modification, be reversible, in case we later discover it does more harm than good. That became one of my modification standards. * Management is like MR TRUMP in current Presidential Election = there are bosses with zero experience as politicians or customer service, where to get things done, you need to be friendly towards people who disagree, so that you can reason with them, try to explain. No, it is their way or the highway, and anyone who dares speak up that something is not a good idea, is to be blasted like they are jackass. For example, everyone knows, they say, that our IBM platform is the most secure in the world, so our company does not need to do anything about security, so they operate it like a bank vault which anyone in the world can walk into, no matter that IT has clues that there's more traffic in and out than business needs. * When we periodically get new owners, the assets are sold, but not the liabilities, totally ignoring contracts associated with the running of the company, contracts which get lost in the transition, so the next time there is a battle with Infor, we cannot prove that we paid SSA for the aps missing from their records when Infor took over. The new owners hire managers who know nothing about BPCS, do not have the time to learn anything about it, and in some cases know nothing about any ERP. They issue commands for things to be implemented, which run counter to ERP theory. * FDIC and NCUA insurance only goes up to about $250 k of assets at a single financial institution. Corporate operating funds, profits when we have them, etc. accumulate at a single bank, in quantities far above that which is insured. If it was my money, I would be spreading it around among different institutions, so no more than $ 250 k any one place. Plus, I would give some thought to when it will be needed, see about putting some in short term CDs or other investments, until then. We hear about breaches, where this place or that lost $ millions. They too must have been ignoring the cap on what's insured at a single institution. I also witnessed horrors in earlier career, in trucking, publishing, retail, wholesale, transportation, where there were disconnects between what made prudent sense, and what was actually being done. I have also had a few of my own personal screw-ups. Once upon a time, when it was time to run a backup in evening, and many managers had left their screens signed on in locked offices, I would climb over the false ceiling tiles to get into the locked offices, to end their BPCS sessions. One evening I slipped and partially fell. My lower legs were stuck up there. I was hanging upside down, with hard surfaces below me, the only person in the building. It took me hours to squirm around to get the leverage to extricate myself. I resolved then, that is the last time I try that. My health safety is more important than any IT duty they need of me. I later figured out an alternative approach when there's a hung BPCS session I cannot get at: * Crash the hardware connection; * Vary it off, and also that of another one, which I do have access to. * Switch their network ids; * Bring back up the one I can access, and now the work which was being done on the inaccessible one, is there at the accessible one. * Go thru the rigamarole to recover a crashed BPCS task, and bring to a conclusion whatever the person was doing, in the office locked when he or she went home, leaving BPCS session on, and office locked. Alister Wm Macintyre (Al Mac) -----Original Message----- From: BPCS-L [mailto:bpcs-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]] On Behalf Of Tim Knoebel Sent: Wednesday, July 22, 2015 3:01 PM To: BPCS ERP System Subject: Re: [BPCS-L] Create PO from SO Are you sure you never worked here at Scovill? Your story is very similar to what happened here which now I get to babysit and try to keep it out of trouble! I inherited this mess about a year and a half ago, with previous BPCS experience (12 years ago) coming from a 405cd shop that was transitioning to 6.1. This shop is running at 6.1 which has been highly customized too. New horrors are being reveled weekly. Best regards, Timothy J Knoebel, Sr. iSeries/BPCS Administrator <snip> -- This is the BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l.