Work Center/Operations issue BPCS 4.05CD
"Bud North (PHOENIX)" <[email protected]>
| Newsgroups | gmane.comp.systems.as400.bpcs |
|---|---|
| Message-ID | <[email protected]> |
Have you tried using a load code that includes setup (2,3,5)? Sounds like in your case probably 2 - just setup vs a combination of setup and machine or setup and run. Setup is a fixed time per operation. You would not have the issue in calculating 1.5 hours in your example - but it wouldn't solve the issue of incrementing in whole numbers from 1 to 2 - it would always be 1 hour. In LX, there's an option for a basis code in the routing of 'F' meaning fixed duration qty and you can enter the qty - in your example 500 - and if you were producing 501-1000, it would round up to the next whole number (i.e. 2) and so on for 1001-1500, etc. Bud North, CPIM PHOENIX Business Consulting, Inc. Direct Dial: 508.572.9701 www.phoenixbcinc.com -- This is the BPCS ERP System (BPCS-L) mailing list To post a message email: BPCS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/bpcs-l or email: BPCS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/bpcs-l.