Re: Level Loop Error
Gary Brown <gary.brown-amAT3M5DVhYyHzeer08dnFaTQe2KTcn/@public.gmane.org>
| Newsgroups | gmane.comp.systems.as400.jbausers |
|---|---|
| Message-ID | <OF03647361.59709040-ONCA2573CA.0076D68A-CA2573CA.0077C422@appliedaustralia.com> |
Hi Bill, I think I might have had something like this a long time ago. In our scenario we had product A that has a route that has components B and C We made a batch of product A that was out of specifications, but instead of dumping the batch we decided to re-work the batch into future batches of the product, so our product setup became product A has a route that has components B and C and A This drove MPR/MPS crazy!! Having a product with itself as an input did not compute. I am fairly sure that we were getting the really helpful 'Level Loop Error' message on our reports. I imagine that this type of scenario might also cause Costing to fail. Bottom line check your routes to ensure you have not created an endless loop Regards, Gary Brown IT Manager Applied Australia Pty Ltd _______________________________________________ This is the System 21 Users (SYSTEM21) mailing list To post a message email: SYSTEM21-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/system21 or email: SYSTEM21-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/system21.