Re: What program/file triggers a refresh of MPS ?
"Santos, Fred" <[email protected]>
| Newsgroups | gmane.comp.systems.as400.jbausers |
|---|---|
| Message-ID | <A5EC73063D4062478B4A7F77A57B96FA08996BC0@NSPCRNEXC05.northsafety.int> |
JK. Per the Sys/21 documentation, be sure you have your Demand Policy codes set up with "NO Exclusions". "Demand Policy You can compare forecasts with actual sales orders and use the resulting demand to control the MPS or MRP processing. The decision on which policy is set, should be made once it has been established whether the item is Master Scheduled (MPS) or under the control of the MRP. The method used to calculate forecast demand is controlled by the Consume Forecast flag in the Company Profile, and affects those policies which utilize internal or external forecasts. Note: Any MPS and/or MRP recognized demand which is excluded from the MRP/MPS plan because it offends a demand policy as set here, is identified on the MRP and MPS review inquiries by inclusion of an X in the associated supply status code. E.g. status XS reflects an excluded suggested schedule. You can enter the following options: 0 - Total Actual Demand (No F/C). No Forecasts. The module prevents forecasts being entered and the demand is the sum of sales orders and dependent demand. 1 - F/C Vs Independent Demand. Demand is the greater of forecast or sales. 2 - F/C Vs Total Demand. Demand is the greater of forecast or sales plus dependent demand. 3 - Independent Vs Dependent Demand. Demand is the greater of sales or dependent demand (forecasts may not be entered). 4 - Explode F/C To Inputs. The resulting demand for the inputs depends on the demand policy of the component. No demand would result for the parent itself. 5 - Make To Forecast. Demand is always the forecast entered. 6 - Forecast + Actual Demand. This is total demand. Demand is the total of forecast, sales and independent demand. This Demand Policy must be already set up in major type MPFF. For more information see Maintain Parameters. Note: If this item exists in another production location, you can set up different definitions for it using the override facility. For more information see the Demand Policy field in the fifth Maintain Item Overrides screen." -----Original Message----- From: system21-bounces-Zwy7GipZuJhWk0Htik3J/[email protected] [mailto:system21-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]] On Behalf Of Jim Kerr Sent: Friday, February 29, 2008 6:55 PM To: 'System 21 Users' Subject: [SYSTEM21] What program/file triggers a refresh of MPS ? Does anybody know what function causes a refresh of MPS from Forecast? For example, if the user maintains a forecast item using option 13 on menu MPF, (programs MF110 and MF114) the next time the MPS job is run, the change to the forecast is reflected in the MPS demand. However, if someone was to DFU the forecast file record for an item (MSP75) any change made to quantities for the item are not reflected in the MPS demand for the item after an MPS run. Program MPF114 (F/cast maintenace) makes reference to program DB550 which I thought set some kind of trigger in the forecast but I don't see it being called when I maintain an item forecast. So where else does MPS get its instructions to recalculate demand if a change to the forecast has been made. I am trying to force MRP to perform a recalculation of MRP demand after I have made a mass update to the F/cast file (MSP75) and it is not playing nice which is forcing me to maintain the f/cast using option 13 on menu MPF. _______________________________________________ This is the System 21 Users (SYSTEM21) mailing list To post a message email: SYSTEM21-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/system21 or email: SYSTEM21-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/system21. _______________________________________________ This is the System 21 Users (SYSTEM21) mailing list To post a message email: SYSTEM21-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/system21 or email: SYSTEM21-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/system21.