Landed Cost Codes
"Barbara Byrne" <bbyrne-W1GZM/[email protected]> Tue, 15 Nov 2011 14:06:17 -0500
| Newsgroups | gmane.comp.systems.as400.jbausers |
|---|---|
| Message-ID | <[email protected]> |
Dear All, We are on BASE Aurora 2.2 and have a problem with landed cost code calculations. We have 3 cost codes 02 Freight - Value DT Duty - Percentage SC Service Charge - Percentage We pay DUTY on both supplier cost (PO line value) and Freight We pay SERVICE CHARGE only on supplier cost (PO line value) If we put 1 for compound value on 02 (Freight) code, both % codes compound supplier cost & freight. We have tried the last parameter every which way, but still cannot get it calculating properly. Anybody have a solution? We cannot change SC or DT to value as we want the system to do calculations not the user. Thanks Barbara Byrne IT Manager Greatex Mills Inc. _______________________________________________ This is the System 21 Users (SYSTEM21) mailing list To post a message email: SYSTEM21-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/system21 or email: SYSTEM21-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/system21.