Re: Component with quantity per order, not per end item
denroxi <[email protected]>
| Newsgroups | gmane.comp.systems.as400.mapics |
|---|---|
| Message-ID | <[email protected]> |
we handled it as floortock.....1 each use per mo,.....with a fixed floorstock quantity on the ( location WIP ). An assigned planner would see a negative floorstock in the planning screns for the present or future and take action with the shp floor/ maintenace for a replacement isse to (WIP) or a tool ework Dennis Guy Vaillant cell 401-447-4690 skype....dennis.guy.vaillant In a message dated 09/30/09 14:28:05 Eastern Daylight Time, WRamos-zSmIeidqU5NWk0Htik3J/[email protected] writes: Hello everyone, How are you guys handling a reusable tooling component called out in a work order with a fixed quantity? Instead of having that component multiplied by the MO quantity, we want the quantity to remain fixed. Thanks in advance for your help. Wil Ramos Shur-Lok Company SPS Fastener Division (949) 474-6000 _______________________________________________ This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l. _______________________________________________ This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l.