Re: Upgrade to 7.8 question.
"Joe Perrault" <[email protected]>
| Newsgroups | gmane.comp.systems.as400.mapics |
|---|---|
| Message-ID | <[email protected]> |
For our upgrade to 7.8, this is what we did. Created a test environment (TT) from MM and upgraded to 7.8. After testing, program issues, etc., we backed up and then upgraded MM to 7.8 Reinstalled PLMC to MM. The most time consuming issue was apply PTFs past the 9955 level that we needed and had already applied to MM at 7.7. Joe Perrault -----Original Message----- From: mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected] [mailto:mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]] On Behalf Of Kevin Fox Sent: Wednesday, December 02, 2009 11:44 AM To: MAPICS ERP System Discussion Subject: Re: [MAPICS-L] Upgrade to 7.8 question. Weston Creating a test and training environment (QQ) as you describe is good. I'd recommend that for production "live" system. You first backup MM...then run the upgrade to R7.8, update PLMC, repoint to the forms created in QQ during test and training... You "fall back" is the backup of MM. Nice, clean and less confusing to the users. Kevin -----Original Message----- From: mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected] [mailto:mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]] On Behalf Of Weston Wheat Sent: Wednesday, December 02, 2009 8:47 AM To: MAPICS ERP System Discussion Subject: [MAPICS-L] Upgrade to 7.8 question. Hello All. I have a question that maybe some of you CAS experts can help point me in the right direction. I have been working on getting our production environment to 7.8. So, I have built a 7.8 environment (QQ) from initial install and have successfully immigrated data from our 7.0 production environment (MM) . The QQ environment is at 9955 ptf level. We also run PLMC for labor reporting and Formtastic for MM. I am thinking about these two paths for getting a our production to 7.8. 1. Run the data immigration from MM to QQ . Then installing PLMC for QQ. And then remove MM from the environment list and make QQ the default environment so to speak. That way I would have a fall back if needed. 2. Or be brave, and: Run the data immigration from MM to QQ. Delete MM and then create MM from QQ. That way I would have PLMC working out of the box. But I would crush the old MM and have no fall back. Any thoughts would be helpful. Thanks _______________________________________________ This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l. _______________________________________________ This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l.