Re: Upgrade to 7.8 question.

"Joe Perrault" <[email protected]>
Newsgroups gmane.comp.systems.as400.mapics
Message-ID <[email protected]>
For our upgrade to 7.8, this is what we did.

Created a test environment (TT) from MM and upgraded to 7.8.

After testing, program issues, etc., we backed up and then upgraded MM
to 7.8

Reinstalled PLMC to MM.

The most time consuming issue was apply PTFs past the 9955 level that we
needed and had already applied to MM at 7.7.

Joe Perrault

-----Original Message-----
From: mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]
[mailto:mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]] On Behalf Of Kevin Fox
Sent: Wednesday, December 02, 2009 11:44 AM
To: MAPICS ERP System Discussion
Subject: Re: [MAPICS-L] Upgrade to 7.8 question.

Weston

Creating a test and training environment (QQ) as you describe is good.

I'd recommend that for production "live" system.  You first backup
MM...then
run the upgrade to R7.8, update PLMC, repoint to the forms created in QQ
during test and training...

You "fall back" is the backup of MM.

Nice, clean and less confusing to the users.

Kevin

-----Original Message-----
From: mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]
[mailto:mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]]
On Behalf Of Weston Wheat
Sent: Wednesday, December 02, 2009 8:47 AM
To: MAPICS ERP System Discussion
Subject: [MAPICS-L] Upgrade to 7.8 question.

Hello All.

 

I have a question that maybe some of you CAS experts can help point me
in
the right direction.

 

I have been working on getting our production environment to 7.8.

So, I have built a 7.8  environment (QQ) from initial install and have
successfully immigrated data from

our 7.0 production environment (MM) . The QQ environment is at 9955 ptf
level.

 

We also run PLMC for labor reporting and Formtastic for MM. 

 

I am thinking about these two paths for getting a our production to 7.8.

 

1.       Run the data immigration from MM to QQ . Then installing PLMC
for QQ.

And then remove MM from the environment list and make QQ the default
environment so to speak.

That way I would have a fall back if needed.

 

2.       Or be brave, and: Run the data immigration from MM to QQ.
Delete MM and then create MM from QQ.

That way I would have PLMC working out of the box. But I would crush the
old
MM and have no fall back.

 

Any thoughts would be helpful.

Thanks

 

 

 

 


_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.

_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.