Re: FW: CSM and Credit Card Processing

Kevin Fox <[email protected]>
Newsgroups gmane.comp.systems.as400.mapics
Message-ID <11739740.1260382100123.JavaMail.root@mswamui-valley.atl.sa.earthlink.net>
All

I agree with Bob.  I once had a client that just included the full credit card number with CSV number and expiration date on the pick list.  Then had the shipping clerks use a dial up modem to get final approval!

This meant that EVERY credit card number, expiration date and CSV number was printed on hard copy paper and stored in shipping!

Needless to say, this led to some abuse that was traced back to this company.

They were able to settle for a fine equal to 2 YEARS PROFITS!

This is NOT something to mess with.  And it is certainly not something that anyone without experience should be doing unless they fully understand the laws involved.

Note that not only must the card numbers, expiration numbers be encripted, but the csv number is not to be stored anywhere.  Once an authorization is done the only legal means of ensuring an approved shipment at a later date is using the supplied approval transaction number.  When the shipment occurs later, then this authorization number is resubmitted to receive final approval, which again is a supplied approval transaction number.

Bob...your advice as always is very wise.

Take heed everyone.

Kevin

-----Original Message-----
>From: Bob Hoey <rhoey-5qkV/[email protected]>
>Sent: Dec 9, 2009 7:57 AM
>To: "mapics-l-Zwy7GipZuJhWk0Htik3J/[email protected]" <mapics-l-Zwy7GipZuJhWk0Htik3J/[email protected]>
>Subject: [MAPICS-L] FW:  CSM and Credit Card Processing
>
>Steve,
>It is required by law to store the card number as encrypted data. How do you do that with the extension file?
>Bob
>
>-----Original Message-----
>From: mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected] [mailto:mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]] On Behalf Of Steve Sommer
>Sent: Tuesday, December 08, 2009 1:55 PM
>To: mapics-l-Zwy7GipZuJhWk0Htik3J/[email protected]
>Subject: [MAPICS-L] CSM and Credit Card Processing
>
>
>I have created the CSM-Curbstone interface at a couple of  customers by
>using integrator to setup an extension file linked to order header(the
>record detail for curbstone/MFUKEY) and utilizing UXPC6nnn user exits to
>authorize and capture detail.
>
>Feel free to contact me if you have questions.
>
>Steve Sommer
>Senior Business Consultant
>4Site Associates, LLC
>3507 Greenway Road
>Grand Island, NY  14072
>Phone: 716.773.4428
>Mobile: 716.860.1965
>Email:  [email protected]
>
>
>
>-----Original Message-----
>From: mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]
>[mailto:mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]]On Behalf Of
>mapics-l-request-Zwy7GipZuJhWk0Htik3J/[email protected]
>Sent: Tuesday, December 08, 2009 1:00 PM
>To: mapics-l-Zwy7GipZuJhWk0Htik3J/[email protected]
>Subject: MAPICS-L Digest, Vol 7, Issue 241
>
>
>Send MAPICS-L mailing list submissions to
>	mapics-l-Zwy7GipZuJhWk0Htik3J/[email protected]
>
>To subscribe or unsubscribe via the World Wide Web, visit
>	http://lists.midrange.com/mailman/listinfo/mapics-l
>or, via email, send a message with subject or body 'help' to
>	mapics-l-request-Zwy7GipZuJhWk0Htik3J/[email protected]
>
>You can reach the person managing the list at
>	mapics-l-owner-Zwy7GipZuJhWk0Htik3J/[email protected]
>
>When replying, please edit your Subject line so it is more specific
>than "Re: Contents of MAPICS-L digest..."
>
>
>Today's Topics:
>
>   1. Re:  Question about XA conversion from V5R3 to V6R1 (Kevin Fox)
>   2. Re:  Question about XA conversion from V5R3 to V6R1
>      ([email protected])
>   3.  Question about XA conversion from V5R3 to V6R1 (Kandel, Ed)
>   4.  CSM and Credit Card Processing (cmh501-rDkNP/[email protected])
>   5. Re:  CSM and Credit Card Processing (Bob Hoey)
>
>
>----------------------------------------------------------------------
>
>message: 1
>date: Mon, 7 Dec 2009 13:00:07 -0500 (EST)
>from: Kevin Fox <[email protected]>
>subject: Re: [MAPICS-L] Question about XA conversion from V5R3 to V6R1
>
>Jon
>
>I believe you are correct but I'm not certain.  I can only go by the
>documentation provided by INFOR.  Please see SH15514 (and related SH15608)
>which is the code to convert from V5Rx to V6R1 of iSeries operating system.
>
>Please note the many, many times that this list has discussed the
>maintenance support licenses.
>
>Only the current release and 1 level back are supported by MAPICS now INFOR.
>
>In order to use the conversion tool to migrate from V5Rx to V6R1 the
>documentation states that you must be at XA R6, R7 or R7.8.
>
>Please note that approx. March 31...R9 is to be release which means that
>support as of that date will be for R9 and R7.8.
>
>Progress marches on.
>
>Paying Maintenance and not staying current with release levels is a waste.
>As is writing "programmer annuities" (i.e. custom code, poorly designed and
>documented).  I am not pointing fingers at anyone.  But a general rule is if
>you purchase a package system, you need to always have a plan to keep
>current with the vendor if you are going to write custom code.   This is not
>only true of INFOR but all the other vendors as well.
>
>I worked with an Oracle shop 2 years ago.  They are approximately $180
>million revenue and 400 employees in high tech electronics.  They had to
>upgrade from Oracle Enterprise Apps 11.1 to 11.5.  It cost them 6 months and
>$1.2million to perform the upgrade with a dedicated in house team of 12
>Stakeholder representatives, 4 IT staff (2 DBA's 1 analyst and 1 developer)
>plus 8 full time consultants.
>
>I can tell you I've had similar issues with Epicor, QAD, 4th Shift and many
>other "mid-range ERP" vendors as well. (One 4th shift upgrade for 55 users
>cost $400K!)
>
>So before everyone buries this list with complaints about cost, support etc.
>Stop and think: How culpable are you?
>
>
>-----Original Message-----
>>From: Jon Le Roi <[email protected]>
>>Sent: Dec 7, 2009 12:30 PM
>>To: MAPICS ERP System Discussion <mapics-l-Zwy7GipZuJhWk0Htik3J/[email protected]>
>>Subject: Re: [MAPICS-L] Question about XA conversion from V5R3 to V6R1
>>
>>Hi Orville,
>>
>>Tegal is at XA 5.5 and when I asked our affiliate about moving up to
>>V6R1 I was informed that we could only go to V5R4 with our current
>>release of XA.
>>
>>
>>Regards,
>>Jon Le Roi
>>Director of I.T.
>>Tegal Corporation
>>
>>-----Original Message-----
>>From: mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]
>>[mailto:mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]] On Behalf Of
>>[email protected]
>>Sent: Monday, December 07, 2009 8:17 AM
>>To: mapics-l-Zwy7GipZuJhWk0Htik3J/[email protected]
>>Subject: [MAPICS-L] Question about XA conversion from V5R3 to V6R1
>>
>>Hello,
>>
>>I just ran the following command on our I series.
>>
>>SBMJOB CMD(ANZOBJCVN OPTION(*COLLECT) LIB(*ALLUSR) SPLFILE(*YES)
>>OBJ('/'))
>>JOB(ANZOBJCOL) JOBQ(QPGMR)
>>
>>Then ran:      sbmjob cmd(anzobjcvn option(*report) rpttype(*cvnprb))
>>job(anzobjrpt)
>>
>>The results are below.
>>
>>
>>Auxiliary Storage Pool (ASP) . . . . . . . . . . : 00001      ASP
>>Resource
>>Name : *SYSBAS
>>            -------------Counters-------------
>>                         Total                 Cannot
>> Library          Objects            Convert
>>----------         -----------------  ---------------
>>AMALIB                 10,060            6,026
>>
>>
>>Our XA is at V2R7 PTF @ 07597 PTF package SH15572.
>>
>>
>>Should I be receiving those results mentioned above?
>>
>>
>>
>>
>>
>>Orville Meredith
>>Systems Analyst
>>
>>
>>
>>Gecom Corporation
>>1025 Barachel Lane
>>Greensburg, IN  47240
>>
>>[email protected]
>>
>>812-663-1745 (T)
>>812-663-2230 (F)
>>
>>812-718-9028 (C)
>>(Travel, after 4:00 p.m. weekdays, and weekends ONLY)
>>
>>** This message has been scanned for viruses **
>>_______________________________________________
>>This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
>>To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
>>To subscribe, unsubscribe, or change list options,
>>visit: http://lists.midrange.com/mailman/listinfo/mapics-l
>>or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
>>Before posting, please take a moment to review the archives
>>at http://archive.midrange.com/mapics-l.
>>
>>
>>_______________________________________________
>>This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
>>To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
>>To subscribe, unsubscribe, or change list options,
>>visit: http://lists.midrange.com/mailman/listinfo/mapics-l
>>or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
>>Before posting, please take a moment to review the archives
>>at http://archive.midrange.com/mapics-l.
>>
>
>
>Kevin Fox
>(909) 762-1384 mobile
>
>
>------------------------------
>
>message: 2
>date: Mon, 7 Dec 2009 13:03:11 -0500
>from: [email protected]
>subject: Re: [MAPICS-L] Question about XA conversion from V5R3 to V6R1
>
>
>Jon,
>
>Infor did contact me (less than 10 minutes after posting) to let me know
>that a document (SH15514) explaining what needs to happen.
>
>Had to order cd that will convert the files for me (over 3 gigabytes - to
>large for downloading).
>
>
>Orville Meredith
>Systems Analyst
>
>Gecom Corporation
>1025 Barachel Lane
>Greensburg, IN  47240
>
>[email protected]
>
>812-663-1745 (T)
>812-663-2230 (F)
>
>812-718-9028 (C)
>(Travel, after 4:00 p.m. weekdays, and weekends ONLY)
>
>
>
>
>             "Jon Le Roi"
>             <[email protected]
>             >                                                          To
>             Sent by:                  "MAPICS ERP System Discussion"
>             mapics-l-bounces@         <mapics-l-Zwy7GipZuJhWk0Htik3J/[email protected]>
>             midrange.com                                               cc
>
>                                                                   Subject
>             12/07/2009 12:33          Re: [MAPICS-L] Question about XA
>             PM                        conversion from V5R3 to V6R1
>
>
>             Please respond to
>             MAPICS ERP System
>                Discussion
>             <mapics-l@midrang
>                  e.com>
>
>
>
>
>
>
>Hi Orville,
>
>Tegal is at XA 5.5 and when I asked our affiliate about moving up to
>V6R1 I was informed that we could only go to V5R4 with our current
>release of XA.
>
>
>Regards,
>Jon Le Roi
>Director of I.T.
>Tegal Corporation
>
>-----Original Message-----
>From: mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]
>[mailto:mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]] On Behalf Of
>[email protected]
>Sent: Monday, December 07, 2009 8:17 AM
>To: mapics-l-Zwy7GipZuJhWk0Htik3J/[email protected]
>Subject: [MAPICS-L] Question about XA conversion from V5R3 to V6R1
>
>Hello,
>
>I just ran the following command on our I series.
>
>SBMJOB CMD(ANZOBJCVN OPTION(*COLLECT) LIB(*ALLUSR) SPLFILE(*YES)
>OBJ('/'))
>JOB(ANZOBJCOL) JOBQ(QPGMR)
>
>Then ran:      sbmjob cmd(anzobjcvn option(*report) rpttype(*cvnprb))
>job(anzobjrpt)
>
>The results are below.
>
>
>Auxiliary Storage Pool (ASP) . . . . . . . . . . : 00001      ASP
>Resource
>Name : *SYSBAS
>            -------------Counters-------------
>                         Total                 Cannot
> Library          Objects            Convert
>----------         -----------------  ---------------
>AMALIB                 10,060            6,026
>
>
>Our XA is at V2R7 PTF @ 07597 PTF package SH15572.
>
>
>Should I be receiving those results mentioned above?
>
>
>
>
>
>Orville Meredith
>Systems Analyst
>
>
>
>Gecom Corporation
>1025 Barachel Lane
>Greensburg, IN  47240
>
>[email protected]
>
>812-663-1745 (T)
>812-663-2230 (F)
>
>812-718-9028 (C)
>(Travel, after 4:00 p.m. weekdays, and weekends ONLY)
>
>** This message has been scanned for viruses **
>_______________________________________________
>This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
>To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
>To subscribe, unsubscribe, or change list options,
>visit: http://lists.midrange.com/mailman/listinfo/mapics-l
>or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
>Before posting, please take a moment to review the archives
>at http://archive.midrange.com/mapics-l.
>
>
>_______________________________________________
>This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
>To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
>To subscribe, unsubscribe, or change list options,
>visit: http://lists.midrange.com/mailman/listinfo/mapics-l
>or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
>Before posting, please take a moment to review the archives
>at http://archive.midrange.com/mapics-l.
>
>
>
>** This message has been scanned for viruses **
>
>------------------------------
>
>message: 3
>date: Mon, 7 Dec 2009 18:13:34 +0000
>from: "Kandel, Ed" <[email protected]>
>subject: [MAPICS-L] Question about XA conversion from V5R3 to V6R1
>
>Orville,
>You should be okay since you are on a supported release.  After migration
>you can overlay your objects with the i 6.1 Conversion Tool (SH15514).  It
>works great, we were one PCM lower than you and it worked without issues.
>
>Regards,
>Ed
>
>
>
>------------------------------
>
>message: 4
>date: Tue, 8 Dec 2009 11:10:51 -0500
>from: <cmh501-rDkNP/[email protected]>
>subject: [MAPICS-L] CSM and Credit Card Processing
>
>After out Release 7.8 implementation we are looking to implement CSM.  One
>of the stumbling blocks is bringing over the Credit card user exit.  We use
>the credit card user exit to authorize credit card transactions with our
>Curbstone software and an authorization code / denial code is displayed to
>the user in green screen.
>
>Has anybody utilitized credit card processing in CSM and how did you handle
>it?
>
>Thank you,
>Candy Hein
>
>
>------------------------------
>
>message: 5
>date: Tue, 8 Dec 2009 10:17:23 -0600
>from: Bob Hoey <rhoey-5qkV/[email protected]>
>subject: Re: [MAPICS-L] CSM and Credit Card Processing
>
>Hi Candy,
>Please contact us directly to review your options. At Lexel we offer
>products and services for integrating XA with Curbstone.
>Bob
>rhoey-5qkV/[email protected]
>
>-----Original Message-----
>From: mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected] [mailto:mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]]
>On Behalf Of cmh501-rDkNP/[email protected]
>Sent: Tuesday, December 08, 2009 11:11 AM
>To: mapics-l-Zwy7GipZuJhWk0Htik3J/[email protected]
>Subject: [MAPICS-L] CSM and Credit Card Processing
>
>After out Release 7.8 implementation we are looking to implement CSM.  One
>of the stumbling blocks is bringing over the Credit card user exit.  We use
>the credit card user exit to authorize credit card transactions with our
>Curbstone software and an authorization code / denial code is displayed to
>the user in green screen.
>
>Has anybody utilitized credit card processing in CSM and how did you handle
>it?
>
>Thank you,
>Candy Hein
>_______________________________________________
>This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
>To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
>To subscribe, unsubscribe, or change list options,
>visit: http://lists.midrange.com/mailman/listinfo/mapics-l
>or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
>Before posting, please take a moment to review the archives
>at http://archive.midrange.com/mapics-l.
>
>
>
>------------------------------
>
>_______________________________________________
>This is the MAPICS ERP System Discussion (MAPICS-L) digest list
>To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
>To subscribe, unsubscribe, or change list options,
>visit: http://lists.midrange.com/mailman/listinfo/mapics-l
>or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
>Before posting, please take a moment to review the archives
>at http://archive.midrange.com/mapics-l.
>
>
>
>End of MAPICS-L Digest, Vol 7, Issue 241
>****************************************
>
>_______________________________________________
>This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
>To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
>To subscribe, unsubscribe, or change list options,
>visit: http://lists.midrange.com/mailman/listinfo/mapics-l
>or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
>Before posting, please take a moment to review the archives
>at http://archive.midrange.com/mapics-l.
>
>_______________________________________________
>This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
>To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
>To subscribe, unsubscribe, or change list options,
>visit: http://lists.midrange.com/mailman/listinfo/mapics-l
>or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
>Before posting, please take a moment to review the archives
>at http://archive.midrange.com/mapics-l.
>


Kevin Fox
(909) 762-1384 mobile
_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.