Re: Product structure routings

"Kevin D Fox" <[email protected]>
Newsgroups gmane.comp.systems.as400.mapics
Message-ID <363669341-1278611145-cardhu_decombobulator_blackberry.rim.net-925407790-@bda483.bisx.prod.on.blackberry>
When you fail...don't say this group did not warn you.

There is an obvious lack of understanding.

This is a complex subject.

Here is one question to illustrate:  what are you going to do with the IX transactions?

Kevin
Sent from my Verizon Wireless BlackBerry

-----Original Message-----
From: Guy Henza <[email protected]>
Sender: mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]
Date: Thu, 8 Jul 2010 12:26:13 
To: <mapics-l-Zwy7GipZuJhWk0Htik3J/[email protected]>
Reply-To: MAPICS ERP System Discussion <mapics-l-Zwy7GipZuJhWk0Htik3J/[email protected]>
Subject: Re: [MAPICS-L] Product structure routings


Thanks to everyone again.

 

I have meet with my users and we have decided on the following;

1. I have to DBU the inventory file and change the INVENTORY CODE to 1.  All orders are closed so it shouldn't have an affect on the components. 

2. One user will complete the BOM.

3. Another user will set the FLR STOCK in AMVT02 to a C or U?

4. There was question on whether OPERATION WHERE 1ST USED had to be filled in?

5. And we shall proceed to test in production!  I love my new job.

 


Guy Henza 


 

> From: [email protected]
> To: [email protected]
> Subject: RE: [MAPICS-L] Product structure routings
> Date: Thu, 8 Jul 2010 08:48:21 -0500
> 
> Guy, I am fairly new at Mapics, but I know how to do this. The 'list' is
> fairly advanced and will probably not have a good response to these beginner
> questions. But
> I can help you with this if you would like. It is simple as long as you
> have correct BOM's and correct Warehouses setup for the parts. I will
> explain the way we do it, and then you can call me if you would like.
> 
> In my case:
> Warehouse 1 = main warehouse
> Warehouse E = Sub-assembly
> 
> The basic way to deplete parts is through a Manufacturing order.
> 
> Assembly 123 has components A, B, C, and D.
> 
> First the assembly and components all must have Item Balance records for the
> warehouse (warehouse E) that the Manufacturing Order is created for. Also,
> on screen AMI7A5 in the Item Master File Maint., there is a field named
> "Controlled Floor Stock". This field must have a "C" for the component
> items, in the warehouse where the assembling is being performed (warehouse
> E). Parts A,B,C,D are all stored in Warehouse 1 so they will have a
> warehouse Item Balance as well. Create the manu. Work Order. Once the
> parts are assembled, we perform an (RM) Manufacruing Receipt which closes
> the Work Order and purrges all parts parts if they are set-up correctly.
> 
> I know this is vague, but I will help as much as I can. You may call if you
> would like.
> 
> Todd Ivy
> 
> TYMCO, Inc.
> 225 E. Industrial Blvd
> Waco, Tx 76705
> 
> T:(254) 799-5546 Ext:389
> F:(254) 799-2722
> 
> www.tymco.com <http://www.tymco.com>
> 
> 
> 
> 
> 
> 
> -----Original Message-----
> From: mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]
> [mailto:mapics-l-bounces-Zwy7GipZuJhWk0Htik3J/[email protected]]On Behalf Of Guy Henza
> Sent: Thursday, July 08, 2010 8:10 AM
> To: mapics-l-Zwy7GipZuJhWk0Htik3J/[email protected]
> Subject: Re: [MAPICS-L] Product structure routings
> 
> 
> 
> Thank you to everyone who has replied so far.
> 
> OK, management has decided that backflushing is the way to go. I have until
> the end of the day to get four items with four componets setup for
> backflushing. Anyone got a 30 minute turtotral on how to set up
> backflushing?
> 
> I found a series of manuals starting with MAPICSXA.pdf but nothing on
> backflushing.
> 
> Regards,
> 
> Guy Henza
> 
> 517-278-2391 x248
> 
> _________________________________________________________________
> The New Busy is not the too busy. Combine all your e-mail accounts with
> Hotmail.
> http://www.windowslive.com/campaign/thenewbusy?tile=multiaccount&ocid=PID283
> 26::T:WLMTAGL:ON:WL:en-US:WM_HMP:042010_4
> _______________________________________________
> This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
> To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
> To subscribe, unsubscribe, or change list options,
> visit: http://lists.midrange.com/mailman/listinfo/mapics-l
> or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
> Before posting, please take a moment to review the archives
> at http://archive.midrange.com/mapics-l.
> 
> 
 		 	   		  
_________________________________________________________________
The New Busy think 9 to 5 is a cute idea. Combine multiple calendars with Hotmail. 
http://www.windowslive.com/campaign/thenewbusy?tile=multicalendar&ocid=PID28326::T:WLMTAGL:ON:WL:en-US:WM_HMP:042010_5
_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.

_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.