Re: Planning for scrap due to machine setup
Dale Gindlesperger <dale_gindlesperger-/[email protected]>
| Newsgroups | gmane.comp.systems.as400.mapics |
|---|---|
| Message-ID | <[email protected]> |
Hi Vic, I had the same thing in my wood department - we always had to toss the 1st part. I couldn't find an acceptable way to handle it at the time (this started in the DB days), so I just programagically did it as a part of order release (I had created a user exit in the middle of the order release process) - you could also add it to the shop packet print process. Easy to do, if the value is already a 1 for that work center, skip the record, otherwise Z-ADD a 1 into it. VERY minor change in a almost totally static program. I don't like modifying code (you know that), but if you have to, a program that hasn't changed in a long time is the safest place to do it. Dale (Cork) Gindlesperger, CPIM Knowledge is knowing a tomato is a fruit. Wisdom is not putting it in a fruit salad. ________________________________ From: Vic Belebczuk <vbelebczuk-z6Jt9gKu7/O/t4LUGa9KWQC/[email protected]> To: MAPICS ERP System Discussion <mapics-l-Zwy7GipZuJhWk0Htik3J/[email protected]> Sent: Fri, November 12, 2010 2:17:59 PM Subject: Re: [MAPICS-L] Planning for scrap due to machine setup Certain work centers always create scrap during setup of the machining operation. Expected scrap quantity will be "1" regardless of operation quantity. Is there a way to have MRP and order release automatically adjust component qtys to allow for this? Both the Qty per in the product structure and the Yield in the routing operation are ratio based, so they are not a good fit because we do not have standard run qtys. From one mfg order to the next there could be a big difference in qty, so (for instance) using .9 in the Yield would work OK for a small qty but would greatly exaggerate scrap for a large M.O. Has anyone developed a solution for this? Thanks, Vic This electronic message transmission is intended only for the use of the party to which it is addressed, including any attachments and contains information from AeroControlex Group Inc., which may be privileged, confidential, or protected by law. If you are not the intended recipient you are hereby notified that any dissemination, copying or distribution of this e-mail or its contents is strictly prohibited. If you have received this message in error, please notify us immediately by replying to the message and deleting it from your computer. Thank you. ITAR Notice: This email may contain technical data which may be controlled by the US International Traffic in Arms Regulation (ITAR) 22 CFR part 120-130. If this data is determined to be ITAR controlled, such data may not be transmitted, shared or provided to any foreign party or entity either verbally or visually without proper licenses from the State Department. It is your responsibility to assure this item can be legally sh! ared with another party. _______________________________________________ This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l. _______________________________________________ This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l.