FW: Implementing Standard Costing

"LeLeux, James" <[email protected]>
Newsgroups gmane.comp.systems.as400.mapics
Message-ID <03B42F10470C7A47B3571990353A253B15356E31BB@JKVMAILBOX1.spsfastener.com>
Happy New Year all!

I am looking at implementing standard costing (XA R6) and was curious if anyone knew of any guides from Infor or other sources to assist.

I see that we need to re-tailor from Actual to Standard (what will that impact?). We currently use actual costing, but it is well structured outside of MAPICS.

And not sure about this other PCC question currently set to NO:
C17 DO YOU WANT TO HAVE GENERAL LEDGER DISTRIBUTION?

Do the Router Variance (RV), Purchasing Variance (PV), and Material Usage Variance (MUV) reports come out of AMC530 (Order closeout and purge)?
Are there any practical guides to the parameters for AMC530 as well as cost roll-ups?


I did search the ML, but it was very issue specific, and I'm still at the 10,000 foot level.



Thanks in advance for any direction you may provide!



Looks like we have all out interfaces on except one:

           ENTER INTERFACE SELECTION:  1 - DEACTIVATE
                                       2 - ACTIVATE

 SEL  FROM APPLICATION                     TO APPLICATION

  2  Accounting Mgmt Accounts Payable     Accounting Mgmt General Ledger

2          Accounting Mgmt Accounts Payable     Inventory Management
  2  Accounting Mgmt Accounts Payable     Production Control and Costing
  1  Accounting Mgmt Accounts Receivable  Accounting Mgmt Accounts Payable


  2  Accounting Mgmt Accounts Receivable  Accounting Mgmt General Ledger
  2  Customer Order Management            Accounting Mgmt Accounts Receivable
  2  Customer Order Management            Master Production Schedule Planning
  2  Customer Order Management            Material Requirements Planning
  2  Inventory Management                 Customer Order Management
  2  Inventory Management                 Material Requirements Planning
  2  Inventory Management                 Product Data Management
  2  Inventory Management                 Production Control and Costing
  2  Master Production Schedule Planning  Material Requirements Planning
  2  Material Requirements Planning       Inventory Management
  2  Material Requirements Planning       Product Data Management
  2  Payroll                              Accounting Mgmt General Ledger
  2  Payroll                              Production Control and Costing
  2  Product Data Management              Inventory Management
  2  Product Data Management              Material Requirements Planning
  2  Production Monitoring and Control    Inventory Management
  2  Production Monitoring and Control    Payroll
  2  Production Monitoring and Control    Production Control and Costing
  2  Purchasing                           Material Requirements Planning


James LeLeux
IT Director: Cherry, Shur-Lok, & SPS Santa Ana
1224 East Warner Avenue
Santa Ana, CA 92705
M   714-929-8063
[email protected]<mailto:[email protected]>

_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.