Refresh data in a test environment.

"Weston Wheat" <[email protected]>
Newsgroups gmane.comp.systems.as400.mapics
Message-ID <[email protected]>
Hello All

We are R7.8 . I have a test environment with a lot if devolvement
Integrator projects / objects.

I would like to refresh the data in the test environment from the
production environment data.

 

And I don' really want to do a delete and create routine either, Don't
want to lose the Integrator work in the test environment.

Does anyone have experience with the Environment Refresh option in CAS?

Or know of a good way to refresh the data?

 

Thanks

Weston

_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.