Refresh data in a test environment.
"Weston Wheat" <[email protected]>
| Newsgroups | gmane.comp.systems.as400.mapics |
|---|---|
| Message-ID | <[email protected]> |
Hello All We are R7.8 . I have a test environment with a lot if devolvement Integrator projects / objects. I would like to refresh the data in the test environment from the production environment data. And I don' really want to do a delete and create routine either, Don't want to lose the Integrator work in the test environment. Does anyone have experience with the Environment Refresh option in CAS? Or know of a good way to refresh the data? Thanks Weston _______________________________________________ This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l.