PCC Overhead Calculation

"LeLeux, James" <[email protected]>
Newsgroups gmane.comp.systems.as400.mapics
Message-ID <03B42F10470C7A47B3571990353A253B1D523F014C@JKVMAILBOX1.spsfastener.com>
Hello all,

I'm working on a weekend project (yeah!!!) and am trying to determine what comprises the overhead (found on screen AMC030). What is of particular interest is jobs that spanned quarters. So how can I calculate how much of the overhead was incurred in Q1 and how much in Q2?

I've reviewed the MAPICS PCC manual that described overhead as 50% of labor for the workcenter. However that doesn't pan out for our orders.  Overhead is significantly higher that labor & setup combined.

We are not tailored for standard cost, but last cost.  If that's a factor.

Undoubtedly there is something I am missing, or do not understand.

Any insight would be greatly appreciated.

Thanks in advance!



James LeLeux
IT Director: Cherry, Shur-Lok, & SPS Santa Ana
2701 South Harbor Blvd
Santa Ana, CA 92704
M   714-929-8063
SKYPE james.leleux
[email protected]<mailto:[email protected]>

_______________________________________________
This is the MAPICS ERP System Discussion (MAPICS-L) mailing list
To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected]
To subscribe, unsubscribe, or change list options,
visit: http://lists.midrange.com/mailman/listinfo/mapics-l
or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected]
Before posting, please take a moment to review the archives
at http://archive.midrange.com/mapics-l.
lmpx.com only provides a reader for public news (NNTP) servers. It is not affiliated with the servers or forums shown here and is not responsible for the content of articles, which is written by their respective authors.