PCC Overhead Calculation
"LeLeux, James" <[email protected]>
| Newsgroups | gmane.comp.systems.as400.mapics |
|---|---|
| Message-ID | <03B42F10470C7A47B3571990353A253B1D523F014C@JKVMAILBOX1.spsfastener.com> |
Hello all, I'm working on a weekend project (yeah!!!) and am trying to determine what comprises the overhead (found on screen AMC030). What is of particular interest is jobs that spanned quarters. So how can I calculate how much of the overhead was incurred in Q1 and how much in Q2? I've reviewed the MAPICS PCC manual that described overhead as 50% of labor for the workcenter. However that doesn't pan out for our orders. Overhead is significantly higher that labor & setup combined. We are not tailored for standard cost, but last cost. If that's a factor. Undoubtedly there is something I am missing, or do not understand. Any insight would be greatly appreciated. Thanks in advance! James LeLeux IT Director: Cherry, Shur-Lok, & SPS Santa Ana 2701 South Harbor Blvd Santa Ana, CA 92704 M 714-929-8063 SKYPE james.leleux [email protected]<mailto:[email protected]> _______________________________________________ This is the MAPICS ERP System Discussion (MAPICS-L) mailing list To post a message email: MAPICS-L-Zwy7GipZuJhWk0Htik3J/[email protected] To subscribe, unsubscribe, or change list options, visit: http://lists.midrange.com/mailman/listinfo/mapics-l or email: MAPICS-L-request-Zwy7GipZuJhWk0Htik3J/[email protected] Before posting, please take a moment to review the archives at http://archive.midrange.com/mapics-l.